My to-do-list for 2024
It's been a slow month for completions.
The NBAQG QuiltFest took up most of my time.
Since that time, I have accomplished zero in September, and doubt there will be much more in October.
1. Donna's memory quilt or two, depending on how it goes together.
I have the second box and have started deconstructing it.
I think I have decided on at least one of the patterns.
3. I'd like to make some memory teddy bears from Rob, Lillian, and Donna's leftovers.
Lillian's bears are cut.
I need to mix the two fabrics to mix and match the bears. They will give me one more shirt next month to make the 10th bear.
I mixed up the fabrics and started one bear, but have not finished anything.
4. Wedding quilt
(This one may be delayed for a bit)
I have 5 of the one block done.
I need to make 4 of the second block to ensure this will work.
I don't know how big it will become.
5. Ashley's High School Graduation Quilt
All the T-shirts are deconstructed.
9. At least one of the Stashbuster UFO numbers each month (12/24 in the year)
Finished 8/22 (36%)
The year has not been as expected with all the health issues, so having completed anything is a bonus.
March #2 5-Pocket Pouches
I'm using these as leaders/enders to prepare all the pockets, and then I'll put them all together at once.
March #53 Christmas Trees
This will have more mug rugs made.
It really isn't Christmas trees.
I won't remove it from the list until I've used all the paper-pieced printouts.
April #19 is Bench Pillows/Door decorations/swatter sweaters
May #11 Ashley's HS Organization/Miscellaneous T-shirt Quilt
June #3 A Heritage Quilt
I'll take it with me on vacation and finish cutting.
Had a problem, so it still needs to be cut out.
August #6 America's Pride
This is an applique project.
The applique is traced on the fusible.
There will be hand stitching after everything is fused.
August #34 Butterfly Bliss Panel
It's going in time out.
September #1, 2019 Shop Hop
It's not even going to be looked at.
September #27 Bow Ties
Again, it's not even going to be looked at.
October #12 Ashley T-shirt Quilt
I would love to do this one for Christmas.
October #66 Dear Jane
I doubt that I'll even look at this one.
November #8 Arrowhead
This is one that I want to finish.
It is named Arrowheads, but I used Christmas fabrics.
November #17 Bears - Lillian (10)
I have one almost together, and I want them done for Christmas, so I hope to finish the 10.
10. Complete 80% (9-10) of the All People Quilt Challenge projects.
Un-Finished 7/14 (50%)
March
#2 5-pocket Pouch
#53 Christmas Trees
April
#19 Bench Pillow/Monthly items (partially done)
May
#11 Ashley High School Organization & Misc Quilt
June
#3 A Heritage Quilt
July
#10 Ashley T-shirt Grocery Bags
One more to make.
A black stabilizer was needed to finish this UFO.
August
#8 Sweater Swatters
There are 12 of these; some are done, and some are not.
November
#3 Hive Mind
===================================
COMPLETED in ALL categories
You can see the January completions here. You can see the February completions here. You can see the March completions here. You can see the April completions here. You can see the May completions here. You can see the June completions here. You can see the July completions here. You can see the August Completions here. You can see the September/October Completions here.
October Completions:
Most of the tote bags were done, but I found one more while cleaning. :(
1 comment:
Only because you are still at block stage, 1 corner HST is turned the wrong way.
Post a Comment