Thursday, June 15, 2023

Wednesday update

 I finished the binding on the test quilt.

Of course, I can't show you a photo, but I love the quilt.

I figured out the sashing for the small T-shirt quilt.

I'm not sure the darker one is going to be used, but it might.

I have the first of four columns ready to add the 'hanging' ribbon.

I have already figured out what sizes I need between the blocks.

I'll trim them to 15" when I get them centered on the section above. 

I just figured out that on Tuesday, I will be sewing with a friend, and I will use that time to finish up the crayon rolls for another friend.

I hope this plan works because I would like to have those 55 crayon rolls finished and off to Tammy.

I doubt I will have any time between now that Tuesday.

Tuesday, June 13, 2023

Tuesday

This is another Memory quilt for a man who used to work with me.
There are only 9 shirts, so it should go quickly.


This is a high school T-shirt quilt with ribbons.
I'm working on getting the shirts to a 15-inch width.
Yes, I know the one is upside down...I fixed it.

I quilted the test quilt and now to get the binding sewn on.
I might have a project to work on tonight or tomorrow night.



 

Monday, June 12, 2023

June accountability

  I need to focus on accountability.

So, my plans for May and June are:

DONE 1. Quilt NBAQG Charity Quilts

Finished the last charity quilt I have and I'll not be at the meeting this month, so I won't have anymore until July.

2. Finish Rob's Cross Heart Quilt

It's ready to quilt.

3. Finish Amy's T-shirt Quilt
I have the go-ahead for the design and will work on this as the month goes on.

5. Crayon Rolls

I have 55 more to make for my friend Tammy.

They are all cut out and need to be marked and sewn.

If I can find a couple days to work on them, I can get them done.

DONE 6. Senior Center project


The next class is a patriotic placemat with a pocket.
The sample is made, and everything is cut for the class on Friday.

6a. Senior Center Towel project
They finished the placemats, so I need another project.
So, it is a patriotic towel

7. Class three zipper pouch

All the fabric is picked and being cut out.
The class is next Saturday (6/15/23).

8. Quilt Test Quilt


Stash Report 11 June 2023

    quilt paint create links to all our stash reports. 


 


Used this Week (since the last report):
6.97 yards

Total Used Year to Date:
Donated fabric
45.26 yards
5.00 yards
Net Stash used in May
12.60 yards

Added this Week:
10.00 yards

Added Year to Date:
20.00 yards

New Goal:
200.00 yards

Yards to the goal:
154.74 yards


A couple of other fun facts are:
Prairie Moon is doing a 350-block challenge:

Total Number of equivalent blocks:
270
Perimeter in inches:
381.62
Numer of UFOs completed
UFO Yardage Used
16
42.80
Percentage of yardage used in UFOs:
83%

Number of Bobbins Used this Week:
2
Number of Bobbins Used this Year:
28
Number of Spools Used this Week:
Number of Spools Used this Year:
1
3

Thursday, June 8, 2023

Progress - May

  My to-do-list for 2023

It seems I have been distracted and have not finished these yet.

2. Memory quilt from Rob's shirts. I am adding a colored border from the shirts (one side to go), and then there will be an outside border for the final one. 


3. Second Memory quilt from Rob's T-shirts. They are cut and stabilized, so it should go fairly quickly.

4. Lillian's baby clothing memory quilt is almost finished. I need to cut more baby clothing and even out the boy and girl fabric. I made her two quilts with her twin's clothing. I am in the process of making her one with both boy and girl clothing in it. I use this one as a leader/ender, and it is growing. I've run out of the girl fabrics and need to cut more.

5. Donna's memory quilt or two, depending on how it goes together. I think I will be doing hers in a heart shape.

6. I'd like to make some memory teddy bears from Rob, Karen, Lillian, and Donna's leftovers.

8. Larger hexagon pillow from Karen's leftover fabrics.

9. Karen's Zinna Pillow

10. Driesbach T-shirt quilt. 

Started to cut the 'hanging strips'.

11. Hawaiian pants for Ashley

12. Hawaiian Applique

I finished one part of the Hawaiian Applique. 

There are two or three of them.

I need to figure out what I'm doing with all of them.

12. Hawaiian Sashiko

I worked on this the first night at the retreat but nothing after that.

I am working on it while in the car with Randy driving.

13. Off Kilter

16. Christmas Panel - Winter's Eve

FINISHED

DONE 14. Test Quilt

The Test Quilt is finished, but I can't show a photo of it.

DONE 15. Baby items for Ashley's hope chest

It's a diaper clutch.

DONE 17. Pumpkin Table Topper


Finally finished this small table topper.

They are fun to use scraps.

DONE 18. Thanksgiving Table Topper.

This was a simple pattern but is finished.

DONE 1. Leach Pillows to use up the remaining T-shirts, I'll be making body pillows. I ended up making 5 tote bags too.

  

  

  

  

  

  

  
It feels good to have these done and picked up.
I think she loved them. 

DONE 7. Karen's Hexagons

May/Jun Accountability

 I need to focus on accountability.

So, my plans for May and June are:

DONE 1. Quilt NBAQG Charity Quilts

I have a Spiderman one on the long arm right now.


I'm making spiderwebs across the quilt.

I know I'll pick up two more at the guild meeting.


A Car quilt 

2. Finish Rob's Cross Heart Quilt

I have one inner border side to add and then the outer border.

At that point, it will be ready to quilt.

3. Finish Amy's T-shirt Quilt
I have the go-ahead for the design and will work on this as the month goes on.

4. Test Quilt
I can't show a photo of the test quilt.
I finished the test quilt top and have the backing ready to load and quilt.

5. Crayon Rolls

I have 55 more to make for my friend Tammy.

They are all cut out and need to be marked and sewn.

If I can find a couple days to work on them, I can get them done.

DONE 6. Senior Center project


We had our first session, and everyone enjoyed it.
I will need to develop something else for the second session because everyone is close to finishing them.

The next class is a patriotic placemat with a pocket.
The sample is made, and now to cut out everything for the class on Friday.

7. Radio Waves Baby Quilt
It is done and ready for delivery.
This is the quilt that did not want to be made.