My to-do-list for 2024
This list will change throughout the year, but I must focus on completing these things.
1. Donna's memory quilt or two, depending on how it goes together.
I have the second box and have started deconstructing it.
I think I have decided on at least one of the patterns.
3. I'd like to make some memory teddy bears from Rob, Lillian, and Donna's leftovers.
4. Wedding quilt
I have 5 of the one block done.
I need to make 4 of the second block to ensure this will work.
I'm not sure how big it will become.
5. Ashley's High School Graduation Quilt
All the T-shirts are deconstructed.
8. Memory T-shirt Pillows for Lillian
I've deconstructed all of them.
I've matched zippers to each T-shirt.
Now, to get them finished.
9. At least one of the Stashbuster UFO numbers each month (12/24 in the year)
Finished 6/12 (50%)
March #2 5-Pocket Pouches
I'm using these as leaders/enders to prepare all the pockets, and then I'll put them all together at once.
March #53 Christmas Trees
This will have more mug rugs made.
It really isn't Christmas trees.
I won't remove it from the list until I've used all the paper-pieced printouts.
April #19 is Bench Pillows/Door decorations/swatter sweaters
May #11 Ashley's HS Organization/Miscellaneous T-shirt Quilt
June #3 A Heritage Quilt
This one is a larger quilt that I'm not sure is even all cut out.
I started it and then stopped.
If I don't finish it this month, I'll take it with me on vacation and make sure it is all cut out.
June #32 Brown & Blue Swap Blocks
10. Complete 80% (9-10) of the All People Quilt Challenge projects.
My APQ quilts are all off the numbering system since I've finished 8 of them already this year.
Un-Finished 6/12 (50%)
March
#2 5-pocket Pouch
#53 Christmas Trees
April
#19 Bench Pillow/Monthly items (partially done)
May
#11 Ashley High School Organization & Misc Quilt
June
#3 A heritage Quilt
#32 Brown & Blue Blocks
===================================
COMPLETED in ALL categories
You can see the January completions here.
You can see the February completions here.
You can see the March completions here.
You can see the April completions here.
May Completions:
No comments:
Post a Comment