Wednesday, July 31, 2024

To Do List for July 2024

    My to-do-list for 2024 

It's been a slow month for completions.

The NBAQG QuiltFest took up most of my time.

1. Donna's memory quilt or two, depending on how it goes together.

I have the second box and have started deconstructing it.
I think I have decided on at least one of the patterns.

3. I'd like to make some memory teddy bears from Rob, Lillian, and Donna's leftovers.

Lillian's bears are cut.
I need to mix the two fabrics to mix and match the bears.
They will give me one more shirt next month to make the 10th bear.

4. Wedding quilt
(This one may be delayed for a bit)

I have 5 of the one block done.
I need to make 4 of the second block to ensure this will work.
I don't know how big it will become.

5. Ashley's High School Graduation Quilt

All the T-shirts are deconstructed.

9. At least one of the Stashbuster UFO numbers each month (12/24 in the year)

Finished 7/14 (50%)

March #2 5-Pocket Pouches

I'm using these as leaders/enders to prepare all the pockets, and then I'll put them all together at once.

March #53 Christmas Trees
This will have more mug rugs made.
It really isn't Christmas trees. 
I won't remove it from the list until I've used all the paper-pieced printouts.

April #19 is Bench Pillows/Door decorations/swatter sweaters

May #11 Ashley's HS Organization/Miscellaneous T-shirt Quilt

June #3 A Heritage Quilt
This one is a larger quilt that I'm not sure is even all cut.
I started it and then stopped.
If I don't finish it this month, I'll take it with me on vacation and make sure it is all cut.

July #10 Ashley Grocery Bags
I made lots of these, and then Ashley gave me more to make, which is still open to completion.

July # 49 Christmas Panels
I have these as binding projects for in the car. 
Thirteen of Twenty are bound.

August #6 America's Pride
This is an applique project.
The applique is traced on the fusible.
There will be hand stitching after everything is fused.
I'll be taking this on the vacation.

August #34 Butterfly Bliss Panel
The panel is large and has been trimmed.
The border fabrics are picked, and some are cut.
I hope this one can be finished this month.

10. Complete 80% (9-10) of the All People Quilt Challenge projects.

My APQ quilts are all off the numbering system since I've finished 8 of them already this year.

Un-Finished 7/14 (50%)

March 
#2 5-pocket Pouch
#53 Christmas Trees

April
#19 Bench Pillow/Monthly items (partially done)

May
#11 Ashley High School Organization & Misc Quilt

June
#3 A Heritage Quilt

July
#10 Ashley T-shirt Grocery Bags
One Three more to make.
A black stabilizer was needed to finish this UFO.
But, now DD added two more shirts to the pile. 
  
#49 Christmas Panels
These will be mug rugs.
I didn't like the way they looked for a quilt.
I have 13 of 20 done.

August
#

===================================

COMPLETED in ALL categories
You can see the January completions here.
You can see the February completions here.
You can see the March completions here.
You can see the April completions here.
You can see the May completions here.
You can see the June completions here.

July Completions:


No comments: