4-10 February 2018
1. WITB
First bag was mostly DD's things, with one seam ripper init.
The second was all quilt patterns.
They are now in the pattern drawer, or in sleeve protectors ready to file.
Pick a cabinet and clean it out.
I think it is going to be one of the lower cabinets in my area.
I think I have saved too many plastic baggies from finishing UFOs.
I think it is going to be one of the lower cabinets in my area.
I think I have saved too many plastic baggies from finishing UFOs.
This is the link to the post I made.
4. Organization Challenge
Continue with the blue fabric drawers.
Continue working with the purple drawer.
Continue with the blue fabric drawers.
Continue working with the purple drawer.
5. Quilt Imperfect Squares
Didn't get it loaded this week.
Didn't get it loaded this week.
8. Continue to work on Test quilt for Tammy.
Finished one component for the quilt.
Finished one component for the quilt.
4. Organization Challenge
Continue with the blue fabric drawers.
Continue working with the purple drawer.
Continue with the blue fabric drawers.
Continue working with the purple drawer.
5. Quilt Imperfect Squares
6. Work on Alphabet quilt
Quilt it
Quilt it
7. TQPM Test quilt
8. Continue to work on Test quilt for Tammy.
9. Make St Patrick's door hanger
No comments:
Post a Comment