Updated to do list
Piecing still needs to be done
1. RWB quilt (JC) (was an UFO)
2. Red quilt for teacher (JJ)
3. Red quilt for teacher (AC)
4. Red baby quilt (AC)
6. Pink and green quilt. Started, but not finished. (KB)
Quilting still needs to be done
12. quilt baby quilt (MU)
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt
17. Mug Rug (CA)
Binding still needs to be done
5. Green and Purple quilt (BW)
7. Judy L's bear in the woods. Needs to be done by the 20th (DB)
Label still needs to be done
16. Batik Quilt (SG)
9. Girl Scout quilt. Needs to be done by the 18th. (EF)
8. Baby quilt (M)
17. Baby Quilt
Finished
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11
11. quilt baby quilt (MU)
No comments:
Post a Comment