I have some things I must finish in 2025.
Well, they might not be done, but I'll do my best. 😖
I haven't had a good year to finish the things I wanted to do.
Since my DH passed in May, after all the paperwork is done, I'll be more focused, I hope.
All the paperwork might never be done. LOL
1. Donna's Memory Quilts (4)

First Top is done.
I might add borders, but I want to ensure enough fabric for the other quilts.
Three more to go.
2. Lillian's Memory Bears (10)
I have one started. I should just get them sewn.
3. Ashley High School Graduation Quilt
This quilt is VERY overdue.
COMPLETED Quilts
4. QOV (4)
One was already provided; it was a flag quilt.


I received another one that only needs binding added.
This is the last one that needs to be quilted.
At least one Stashbuster UFO a month (1/10) 10%
January #36 Thru Grandmother's Window
(This is all appliqué)
February #6 Wowza
I won't be able to show this because it is a test quilt that I had trouble with.
February #21 Wedding Quilt
I don't like the design of this quilt, which makes it a challenge.
March #9 Wool Poinsettia Ornaments
I'm working on the ornaments in the evenings.
I'll finish them on the trip.
This is an ongoing project.
I have an idea for a toy made from Yo-Yos.
I'm also taking it on the trip.
April #39 Thread Catchers
I know I can get what is already sewn finished.
I have some thread catchers cut and ready to sew.
I'll probably not get them all sewn for the trip.
May #1 Zoology
This is a panel and should be quick to finish.
I just need to be able to sew.
May was not a good month.
May #15 Wildlife Panel Quilt
Another quick finish if I could get to it.
June #10 Woodsy Bag
This one has very little to be done to complete it.
I need to focus more on it.
June #45 Texas Armadillo Table Runner
I need to find this one to determine what's required to complete it.
July #4 Yellow & Blue Birthday Day Block Swap
July #29 Triple Irish Chain
August #12 Wolf Pack
August #68 Shashiko
This won't be done because I still have some pieces to work on.
This is an ongoing project.
Completed Stashbuster UFOs 3/16(19%)
January #10 Wolf Postcard Wall Hanging
March #43 The Continental
All People Quilt UFOs
At least 50% (3/8) 38%
I've not been great at accomplishing these.
I didn't do a great job of picking what I could finish.:(
January #4 Shelf Curtain
I'll be changing the need for the shelf curtain, but might make window curtains for the extra bedroom with the cut pieces.
March #2 Donna's Memory Quilt
I have the top finished, but I am wondering if I want to add borders, so it will sit until I have a few more of these quilts made.
April #1 Lillian's Bears
I need to just put these together and finish them.
May #9 Gingerbread Wishes
These are in the car for the trip.
I ended up driving, so I didn't get to work on them.
July #5 Oasis Cover
August # 8 Christmas Stocking
September #6 Arrowheads
October #12 Shy Little Kitten
November #3 Wowza
Completed APQ UFOs (3/6) (50%)
December #11 Jo's Retreat Teal & Brown
June #10 Hungry Little Caterpillar
February #7 Bright Rainbow Quilt
No comments:
Post a Comment