DONE 1. Quilt previous test quilt (Interwoven)and get it ready
to take on the trip a week from Sunday to bind in the car.
I started
to get thread ready to quilt this and find out that the thread I want to use is
almost empty. :(
So, I order
it and it will take 5-7 days.
So, I
either use another thread or wait and not take it on the trip.
I'm using
another thread.
Quilting is done.
1a. Bind Interwoven
Binding is on and ready for the trip to work on the hand sewing.
Binding is done and quilt is on my bed.
DONE 2.
Test quilt to be done by the 10th
I can't
show you a photo, but the quilt top is finished and the report turned in
3. Food
embroidery should be done mid-August.
I’ll be taking on the trip.
I am making lots of HST right now.
Backing and binding have been made.
Next is quilting
4. Baby
Clothing quilt done by mid-August.
I’ll be taking on the trip.
108 – 16 patches needed.
26 done before the trip.
32 done after the trip.
40 done.
DONE 5.
Clemens T-shirt #1 quilts to be done by mid-August
Stabilized, cut out, sashing cut and ready to
go.
Backing picked out.
Backing and binding made.
Completed and ready to be picked up today.
DONE 6. 2009 NYE
Mystery to be done by end of August.
Backing found for this.
It has a home now.
Quilting is done.
Binding ready for the trip.
Binding done and ready for a label.
7. Clemens
T-shirt #2 quilts to be done by mid/late August
Shirts are ready to be stabilized.
Amazing how different these are from the same school and same band.
No comments:
Post a Comment