
Came home and DH and DD were working on the yard. They had the one tree ring all cleaned up and some soil put in the ring. They were both having loads of fun.
Came home and DH and DD were working on the yard. They had the one tree ring all cleaned up and some soil put in the ring. They were both having loads of fun.
Needless to say, I didn't get much sewing done.
I just found out that I needed to have a birthday postcard done, so I made this one up this morning. I used different colored threads to randomly stitch the card, appliqued some pre-made appliques on it and colored in some of the columns. I like the variegated look on the edging. And, it is lime green.
I have quilted 2 quilts and have the binding ready to sew down on them. I am in the process of loading another quilt and will get to it sometime tomorrow (I hope).
I'm also sewing together the mystery quilt I did the other weekend. I have it 1/4 sewn together. A friend called and I talked on the phone instead of sewing, but because I'm so tired, it is probably better that way. LOL
Oh, I gave the 30's quilt to it's owner today. I think she liked it. She was talking about all the family names and the stories. It was a neat time for me.
I have my small group tomorrow, so that will be fun. I'll only get to stay for half the day because I need to get my parents at the airport.

The lining is a purple taffeta -- boy does that ravel.
I finished quilting the BOM quilt for a friend. I need to figure out the binding and get it done and in the mail
DH finished my cabinets and half my fabric is back in place. I pray this works. He did move the shelves some and now I need to adjust where I put what fabrics. :(



DH was working on my shelves to make sure they do not fall again. I think he is about half done. He ran out of hardware and had to go get some more. Then we both ran out of steam, so I don't think the baby quilt is going to be finished tonight and I don't think the shelves are going to be finished either.