Monday, April 16, 2018

Design Wall Monday

Linking to Design Wall Monday.

My main design wall has the next T-shirt quilt on it.
I am working on the sashings.
I think I have one more double star point to add and I can get this one together.
It is for a silent auction, so it is fairly quick.
You can see the other one ready to load
I finally got the backing together and as soon as I press it, I'll load this.
I got frustrated with the state quilt, so it is in the same state a it was last time.
I have to work on it this week, so I'll make a goal to focus on a few at a time.
I know when I get it going, I'll enjoy seeing it come together. 
The other design wall looks bare, because I stated on one of the pillows.
I need to get those Irish Stars cut and ready to piece.
the cutting is what takes the time, because it goes together quickly after that,

I didn't have a great week because I had things to do outside the house and when I got home I had headaches that would not go away.
Hoping you have a great week.


Sunday, April 15, 2018

Stash Report

quilt paint create links to all our stash reports
Used this Week:                                            1.00 yards
Used year to Date:                                     112.61 yards
Total out of stash this Month (April               -4.30 yards
Added this Week:                                           0.00 yards
Added Year to Date:                                     10.50 yards
Goal:                                                         200.00 yards
Yards to goal:                                               87.39 yards

Net Used in quilts 2018:                              59.86 yards 


A couple of other fun facts are:

Prairie Moon is doing a 350 blocks challenge this year:
Number of equivalent blocks:                  263
Perimeter in inches                               2916

Number of UFOs finished this year:            14
UFO Yardage Used                                51.75
Amount of yardage used in UFOs              86%

Number of Bobbins Used this week          5

Number of Bobbins Used this year          68
Number of Spools Used this week            0
Number of Spools Used this year            20

Kate at Life in Pieces is doing the challenge of 15 minutes of sewing.

Days of Stitching                                      96%
Number of Days this week                       6/7
Number of Days this month                    100/104

Days Organizing                                       95%
Number of Days this week                       7/7
Number of Days this month                   99/104

It was a strange week.
had lots of birthday lunches and things going on.
I was gone more than normal and then I was tired when I got home.
I started doing Yoga, which made me tired too. LOL
But, I think this coming week will be better.

Friday, April 13, 2018

Not quilting, but reaching out.

One of our dear friends is in need of help. Here is Judy's information.

To My Wonderful Friends,
            If you had the super power to extend the life of another person would you use it? Maybe you do have that super power. And maybe you would be willing to use it to save my life.
            I am writing to you about my current health challenge and how you can help. This is not an easy letter for me to write but am facing a life-threatening situation.
            I have end-stage kidney disease. I have three options for treatment:
Dialysis- Home (peritoneal dialysis PD) or clinic (hemodialysis HD).
Dialysis is only temporary. It is not a cure. Transplants have the most favorable results. For a transplant from a deceased donor the waiting time is eight to ten years and the organ will last eight to ten years.
At my stage in the disease I am not a candidate. A transplant from a living donor has a better outcome, the shorter wait of a few months and will last twice as long.
            Hemodialysis is exhausting and time-consuming with treatment schedules four to five hours three to four times a week. Due to the time constraint of the HD, I would opt for PD.  This would require surgically implanting an access port with a permanent abdominal catheter (a tube hanging out of my abdomen). Each night I would be attached to a machine that would draw my blood out, cleanse it and return it. Due to the risk of infection and injury to the port, I would have to give up my participation in Equessense which would be devastating to me, but more importantly, the ones who are benefited by this life-altering therapy.
Although none of the choices are ideal, the best option would a transplant from a living donor.
I have given a lot of myself in this life. After teaching special education for several decades and then college for several years, I retired to devote more time to my true passion. I direct Equessense, an equestrian therapy program where I use my horses to enhance the lives of individuals with a wide range of abilities and needs. I work very hard for no financial compensation.  My only currency is the joy and progress I see in our athletes.  I am doing everything I can think of to find a living donor, so I can keep giving.  It is very awkward and a huge task to ask someone to give me a body part. It is even more difficult to live a normal life while being on dialysis, especially for someone like me who’s extremely active contributing to my community. But, unless I find a donor, my only choices will be dialysis or death. And, remember, dialysis is temporary.
We are looking for people who are willing to be tested as potential donors or could spread the word for me. To find out id you are a candidate the 1st step is to go online to www.livingdonor-MethodistSA.com to complete the Donor assessment questionnaire.  I think you need to know my name: Judy Hendon, and DOB 06/22/51. 2nd step: Arrange a Donor Assessment appointment at: 
210-575-4483. If you are a qualified donor you will receive a head to toe, inside to out, top notch physical exam for free. If you can help, please do. If you know someone who might, please pass this on to them. I know this is a big request, but I don’t think I’m done making contributions to family, friends and community, especially to our most vulnerable population.
Passing this on to family, friends, work, school, congregation or any other groups to which you belong would be most gratefully appreciated.
To learn more about living kidney donation visit the webpage at:
www.sahealth.com/kidney transplant. Or call the donor hotline:
210-575-4483 to have a confidential conversation and get answers to any questions you have. You don’t even have to disclose your name, only that you are interested in helping Judy Hendon, DOB 06/22/51.

Thank you so much from the bottom of my heart!
Judy

If you happen to be inclined to help, or know someone who is in the san antonio area and know they would help, please let them see this post. Equessense  is the organization that she has founded and helped so many people through. Judy is an amazing woman that deserves a second chance.

Wednesday, April 11, 2018

Learning

Today caused me to learn to attach more backing fabric without unloading the whole quilt.
It worked, but I had to use my channel lock and it wasn't working. 
So, I had to learn how to do that too.
It is quilted.
I am going to see if I can find a binding fabric that I can bind this with.
I need to quilt the T-shirt quilt before I do the second Covered in Love quilt.
I'm just thankful that I was able to adjust the channel lock and add to the backing.
It's a pretty quilt.

Was on a roll

I was on a roll and then.....
The backing is too short for the top. :(
I normally check this out, but apparently didn't.
Even if I had turned it, it would still be short.
Have an email into the person this came from and will see what they want me to do.
Use one of my fabrics, or have them send me one to piece on.
Oh well, guess I'll actually piece some today.

good news is I was reading something about how to add on to backing while still on the long arm.
I can now practice it.

Decluttering

I'm always looking for better ways to figure out what to keep and what to share with others.
Sarah at Early Bird Mom is talking about decluttering today.
She found a site that has a 20/20 rule.
That might just make some things easier to pass on.
though, DH and I are doing a fairly good job at sharing when the Texas Paralyzed Vets pick up in our area or the Children's Hospital truck comes by, or any other group that tells us they are picking things up.
We normally have a couple of bags or boxes for their use.
It's the sentimental things that are harder to pass on.
I am working through the extra bedroom, and I'm going to show a shameful photo.
When I was going through the closet, I had no place to put this "stuff" and it is piled on the bed.
Much of it is wrapping "stuff" and if I were to use the 20/20 rule, it could go.
I will probably keep the wrapping paper itself, but the "saved" tissue paper can go.
The ribbons can probably go too, since I don't normally think to use them.
So, when I tackle this again, I think the 20/20 rule will be used.
Just so you can finish reading on a pretty note, here is a Covered In Love quilt I'm working on today.
I love viney swirls.


Monday, April 9, 2018

Motivational Monday

2-8 April 2018

1.  Bind Fall Quilt

2. Keep working on studio - put away bin of fabric, again.
Before                                                  After

Scraps                                              yardage

There were a lot of leftovers in that bin.
I put away some of the scraps and batting pieces before I took the photo.
It would be good to learn to tackle this after each project. (Sure)
Everything is now put away and I can start filling it again. 

3. Work on T-shirt quilt.
Answer to my problem was one quilt 

and many pillows.

4. Organization Challenge
Flat surfaces still need more help.
My embroidery space is bare. :(
It's amazing how much more open that space is when the machine is gone.
I still need to figure out how to reduce the clutter to the right of my sewing machine.
Maybe now is the time to replace the non-slip under the machine.
The space on my cutting table is a mess.
I had it cleaned, but with all the projects, I have fabric all over it.
The plate for ruler work is there until I find it a home.

pressing table is a mess with current projects.
You need a paper scissor for the steam a seam and you need good scissors for the fabric.
The thread is going to be used on the big T-shirt quilt.

5. Postcards - blue Moon
I forgot I needed to do Batik Beauty too, so another set of postcards.

6. WITB
I worked on a the closet boxes in the extra bedroom
These had all the Girl Scout craft items in it and I have a troop to donate to.
I have 3 boxes/bags to donate to them and found some fun items I'm keeping.
Two crates and two bags going to another troop.

7. Start tracing the Map Quilt
50 out of 50 states have been fused.
They are ready to be cut apart.
I just realized I traced them without mirror imaging them.:(
I have to do this again.

9 - 15 April 2018

1. Quilt CIL

2. Keep working on studio

3. Under Tulle Post Card

4. Organization Challenge
I think I'll work on my desk, the cutting table and the pressing table.

Flat surfaces still need more help.
I'm not sure if this one will every be complete.

5. Quilt T-shirt quilt

6. WITB

7. Re-trace on background fabric and fuse states to the Map Quilt

8. Continue to work on Clemens T-shirt quilt