I have to admit, I'm taking a breather. I did do a larger sized speed strip quilt, but decided to cut it down and border it. so, I'm getting 4 little quilts out of the one. All the prints were novelty prints, so it only makes sense for them to be baby quilts.
I have a fun quilt to quilt for a neighbor. Hopefully will get it loaded tonight and quilted tomorrow.
DH goes to the airport today and then it will be lonely and we will need something to do.
Saturday, June 4, 2011
Wednesday, June 1, 2011
FINISHED
I didn't get the 3 charity quilts quilted this month, but I did finish the ones I needed. So, here is the summary!
4. Red baby quilt (AC) (made one and was not happy with the size, so I'm making this pattern instead. It is a disappearing 4 patch. Fairly easy and I'm making it scrappy like Mom's) Almost completed
3. Red quilt for teacher (AC) This is the larger D4P (disappearing 4 patch) that is the Momma of the one from yesterday. Now to find backing and these these quilted. Already trimmed and binding sewn on. Label is also made
On top of everything else, DD graduated 6th grade.
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11
Ended up making these water bottle carriers too.
Quilting still needs to be done
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt
This is the one that I made, but didn't like the size, so I had to do something different. This still needs to be quilted.
Finished
4. Red baby quilt (AC) (made one and was not happy with the size, so I'm making this pattern instead. It is a disappearing 4 patch. Fairly easy and I'm making it scrappy like Mom's) Almost completed
3. Red quilt for teacher (AC) This is the larger D4P (disappearing 4 patch) that is the Momma of the one from yesterday. Now to find backing and these these quilted. Already trimmed and binding sewn on. Label is also made
On top of everything else, DD graduated 6th grade.
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11
Ended up making these water bottle carriers too. 6. Pink and green quilt. (KB) UFO 5/28/11
2. Red quilt for teacher (JJ)
This is in the washer and ready to dry. I'll post when all is done.
Monday, May 30, 2011
Final update for today.
Sometimes I wish my brain would not think about additional things that need to be done. :(
So, I decided there were 2, actually 4 more folks I wanted to do something for. So, 2 are made and quilted. They are small, so the binding won't take long and I am going to use a standard label that is already stitched out. One will be some quilting items because I just found out that she was going to focus on learning more about quilting. The last one, I'm not sure what I'm going to do for her. Maybe just a gift card?
Quilting still needs to be done
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt
Binding still needs to be done
4. Red baby quilt (AC) (made one and was not happy with the size, so I'm making this pattern instead. It is a disappearing 4 patch. Fairly easy and I'm making it scrappy like Mom's) Almost completed
3. Red quilt for teacher (AC) This is the larger D4P (disappearing 4 patch) that is the Momma of the one from yesterday. Now to find backing and these these quilted. Already trimmed and binding sewn on. Label is also made
2. Red quilt for teacher (JJ) Ready to trim. Need to make binding and label.
19. May's Jo's club (MR) Ready to add binding. This is a last minute addition.
20. May's Jo's club (SD) Ready to add binding. This is a last minute addition.
Label still needs to be done
Finished
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11
11. quilt baby quilt (MU) Mailed 5/14/11
9. Girl Scout quilt. Needs to be done by the 18th. (EF) UFO delivered 12 May 11
8. Baby quilt (M) Delivered 5/12/11
17. Baby Quilt (McC) Delivered 5/12/11
12. quilt baby quilt (MU) Quilting and binding this one. Mailed 5/14/11
7. Judy L's bear in the woods. Needs to be done by the 20th (DB) UFO 5/16/11
16. Batik Quilt (SG) UFO
5. Green and Purple quilt (BW)
1. RWB quilt (JC) (was an UFO)
18. Mug Rug (CA) UFO 5/28/11
6. Pink and green quilt. Started, but not finished. (KB) UFO 5/28/11
So, I decided there were 2, actually 4 more folks I wanted to do something for. So, 2 are made and quilted. They are small, so the binding won't take long and I am going to use a standard label that is already stitched out. One will be some quilting items because I just found out that she was going to focus on learning more about quilting. The last one, I'm not sure what I'm going to do for her. Maybe just a gift card?
Quilting still needs to be done
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt
Binding still needs to be done
4. Red baby quilt (AC) (made one and was not happy with the size, so I'm making this pattern instead. It is a disappearing 4 patch. Fairly easy and I'm making it scrappy like Mom's) Almost completed
3. Red quilt for teacher (AC) This is the larger D4P (disappearing 4 patch) that is the Momma of the one from yesterday. Now to find backing and these these quilted. Already trimmed and binding sewn on. Label is also made
2. Red quilt for teacher (JJ) Ready to trim. Need to make binding and label.
19. May's Jo's club (MR) Ready to add binding. This is a last minute addition.
20. May's Jo's club (SD) Ready to add binding. This is a last minute addition.
Label still needs to be done
Finished
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11
11. quilt baby quilt (MU) Mailed 5/14/11
9. Girl Scout quilt. Needs to be done by the 18th. (EF) UFO delivered 12 May 11
8. Baby quilt (M) Delivered 5/12/11
17. Baby Quilt (McC) Delivered 5/12/11
12. quilt baby quilt (MU) Quilting and binding this one. Mailed 5/14/11
7. Judy L's bear in the woods. Needs to be done by the 20th (DB) UFO 5/16/11
16. Batik Quilt (SG) UFO
5. Green and Purple quilt (BW)
1. RWB quilt (JC) (was an UFO)
18. Mug Rug (CA) UFO 5/28/11
6. Pink and green quilt. Started, but not finished. (KB) UFO 5/28/11
Almost there
I'm quilting away. We went on a drive today and I almost got the baby quilt bound. I have about 3 inches and the 2 sides of the label not on the edge. I'm making progress. Came home and quilted the Momma quilt. That should have binding on it ready to stitch down in about an hour. One more gift quilt that has to be done. The QOVs and Angel Cover Ministry quilts probably won't get done this month, but will early next.
Quilting still needs to be done
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt
2. Red quilt for teacher (JJ)
Binding still needs to be done
4. Red baby quilt (AC) (made one and was not happy with the size, so I'm making this pattern instead. It is a disappearing 4 patch. Fairly easy and I'm making it scrappy like Mom's)
3. Red quilt for teacher (AC) This is the larger D4P (disappearing 4 patch) that is the Momma of the one from yesterday. Now to find backing and these these quilted.
Label still needs to be done
Finished
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11
11. quilt baby quilt (MU) Mailed 5/14/11
9. Girl Scout quilt. Needs to be done by the 18th. (EF) UFO delivered 12 May 11
8. Baby quilt (M) Delivered 5/12/11
17. Baby Quilt (McC) Delivered 5/12/11
12. quilt baby quilt (MU) Quilting and binding this one. Mailed 5/14/11
7. Judy L's bear in the woods. Needs to be done by the 20th (DB) UFO 5/16/11
16. Batik Quilt (SG) UFO
5. Green and Purple quilt (BW)
1. RWB quilt (JC) (was an UFO)
18. Mug Rug (CA) UFO 5/28/11
6. Pink and green quilt. Started, but not finished. (KB) UFO 5/28/11
Sunday, May 29, 2011
Fabric useage
Judy's stash report is what keeps me going.
My stash report for the week is:
Fabric usage goal (100 yards)--USED over 100 yards this year!
Fabric Added This Week --0.00 yards
Fabric Added Year to Date -- 11.00 yards
Fabric Used This Week -- 22.25 yards
Fabric Used Year to Date -- 100.09 yards
Fabric Used this month -- 37.79 yards
My stash report for the week is:
Fabric usage goal (100 yards)--USED over 100 yards this year!
Fabric Added This Week --0.00 yards
Fabric Added Year to Date -- 11.00 yards
Fabric Used This Week -- 22.25 yards
Fabric Used Year to Date -- 100.09 yards
Fabric Used this month -- 37.79 yards
All Tops are pieced
Piecing still needs to be done ALL DONE, now to get the rest of them quilted.
Quilting still needs to be done
4. Red baby quilt (AC) (made one and was not happy with the size, so I'm making this pattern instead. It is a disappearing 4 patch. Fairly easy and I'm making it scrappy like Mom's)
Label still needs to be done
Finished
Quilting still needs to be done
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt4. Red baby quilt (AC) (made one and was not happy with the size, so I'm making this pattern instead. It is a disappearing 4 patch. Fairly easy and I'm making it scrappy like Mom's)
3. Red quilt for teacher (AC) This is the larger D4P (disappearing 4 patch) that is the Momma of the one from yesterday. Now to find backing and these these quilted.
2. Red quilt for teacher (JJ)
Binding still needs to be done10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11
11. quilt baby quilt (MU) Mailed 5/14/11
9. Girl Scout quilt. Needs to be done by the 18th. (EF) UFO delivered 12 May 11
8. Baby quilt (M) Delivered 5/12/11
17. Baby Quilt (McC) Delivered 5/12/11
12. quilt baby quilt (MU) Quilting and binding this one. Mailed 5/14/11
7. Judy L's bear in the woods. Needs to be done by the 20th (DB) UFO 5/16/11
16. Batik Quilt (SG) UFO
5. Green and Purple quilt (BW)
1. RWB quilt (JC) (was an UFO)
18. Mug Rug (CA) UFO 5/28/11
6. Pink and green quilt. Started, but not finished. (KB) UFO 5/28/11
One more top
I'm on to a red and blue quilt and that is the last that I must have done this month.
Piecing still needs to be done
2. Red quilt for teacher (JJ)
Quilting still needs to be done
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt
4. Red baby quilt (AC) (made one and was not happy with the size, so I'm making this pattern instead. It is a disappearing 4 patch. Fairly easy and I'm making it scrappy like Mom's)
3. Red quilt for teacher (AC) This is the larger D4P (disappearing 4 patch) that is the Momma of the one from yesterday. Now to find backing and these these quilted.
Binding still needs to be done
Label still needs to be done
Finished
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11
11. quilt baby quilt (MU) Mailed 5/14/11
9. Girl Scout quilt. Needs to be done by the 18th. (EF) UFO delivered 12 May 11
8. Baby quilt (M) Delivered 5/12/11
17. Baby Quilt (McC) Delivered 5/12/11
12. quilt baby quilt (MU) Quilting and binding this one. Mailed 5/14/11
7. Judy L's bear in the woods. Needs to be done by the 20th (DB) UFO 5/16/11
16. Batik Quilt (SG) UFO
5. Green and Purple quilt (BW)
1. RWB quilt (JC) (was an UFO)
18. Mug Rug (CA) UFO 5/28/11
6. Pink and green quilt. Started, but not finished. (KB) UFO 5/28/11
Subscribe to:
Posts (Atom)
















