Friday, June 12, 2015

Angels

The angel center is sewed together.
I will be putting borders on it tomorrow too.
Probably a white inner border and a blue outer border.

To Do List

To do List for the week

Test table runner
This is pieced, quilted and just needs binding.
I'll not work on it unless I'm riding in the car with DH.
We went to the gym and I bound it on the drive.
It is done, but I can't show you.
T-shirt quilt started
Started cutting the T-shirts apart.
Angels top
I am sewing this one together.
Sewed center together
Dolphin pillow
Trying to determine how much room around the dolphins I need to leave.
I'd like to have some of the fabric to put in the outer border.
Trimmed to 1.5" from the edges of the dolphins.
That gives me a little fabric to incorporate.
Borders on 6" block
This will go with me on Saturday for borders to be put on.
I've picked the fabrics and have it ready to go.
Borders on 6" block
This will go with me on Saturday for borders to be put on.
I've picked the fabrics and have it ready to go.

Clean out a drawer

Prairie Moon Challenge
Clean out one drawer.
The two drawers to clean out. 
Doesn't look much different, but I now know I have rulers in there and triangles on a roll.
I did get rid of a couple templates I'll never use.
I have lots of fabric post cards stored in there and I'd like to come up with a way to display them.

Thursday, June 11, 2015

Accented Chevrons

I tested this pattern for TQPM
by Nancy Noah
I'm redoing my family room in western and this one fits perfectly.
If you have not joined in with the on-line magazine - TQPM, go check it out.

Prairie Moon Organization Challenge

Prairie Moon is challenging us to organizing things in our studio.
Last week we were to pick something we had done before and this is my summary.

I probably always have 10 things to deal with.
I'll pick the next one when I finish one.
1.  Get all the cups downstairs to be washed. 
DONE, now to keep it that way.
2.  File Mom's paperwork.
Not yet finished, but it is all ready to be filed.
3. Find and pass out the fundraiser information.
Need to copy it and get it done.

We are on our way to take the sewing machine in.
It is in the shop and will be done by 3 July 2015.
I have a second machine, so that is no trouble.
I had my list and hope they can fix it all.

This week, the challenge is

Clean out one drawer

I think I will pick drawers under my pressing table.
I don't get into these drawers often.
It looks like a template drawer and a triangles on a roll drawer.
Who knows, I might find things I'd like to use. 

Test quilt

Test quilt is almost quilted.  Broke thread twice and then ran out of bobbin.  I stopped.  LOL
Will finish it tomorrow.
It's pretty.  Wish I could show you what it looks like.

Wednesday, June 10, 2015

Cutting 2.5" squares

I spent the day working on cutting up the baby clothing.
I have a nice pile to continue sewing in pairs.
I am not enjoying the stabilizing and cutting phase, but I think I'll enjoy putting it all together.