Friday, May 13, 2011

photos

This quilt was made by Marianne and i quilted the aliens in my neon green and black thread.  It was fun to quilt.

This is one of my UFOs from 2008.  It will become a teacher quilt for the end of school.  I'm loading it on the long arm tonight.

Next I need to work on getting another quilt pieced and ready to quilt.  Must have one in the binding stage at all times and one ready for when that is done.  Makes waiting easier and makes me feel more productive.  LOL

Update

Semi slow day today.  Had lots of school activities.  But, I did bind a quilt while in a meeting.  Started the next binding and am about half done.  Now, I think I'll load a quilt and hopefully get it quilted tomorrow.

Piecing still needs to be done
2. Red quilt for teacher (JJ)
3. Red quilt for teacher (AC)
4. Red baby quilt (AC)
6. Pink and green quilt. Started, but not finished. (KB) UFO

Quilting still needs to be done
1. RWB quilt (JC) (was an UFO)
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt
17. Mug Rug (CA) UFO

Binding still needs to be done
5. Green and Purple quilt (BW) (working on this binding while waiting)

Label still needs to be done
16. Batik Quilt (SG) UFO
7. Judy L's bear in the woods. Needs to be done by the 20th (DB) UFO

Finished
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11
11. quilt baby quilt (MU)
9. Girl Scout quilt. Needs to be done by the 18th. (EF)UFO
8. Baby quilt (M)
17. Baby Quilt
12. quilt baby quilt (MU) Quilting and binding this one.

Thursday, May 12, 2011

Plans for today.

Piecing still needs to be done

1. RWB quilt (JC) (was an UFO) putting the border on this one
2. Red quilt for teacher (JJ)
3. Red quilt for teacher (AC)
4. Red baby quilt (AC)
6. Pink and green quilt. Started, but not finished. (KB)

Quilting still needs to be done
12. quilt baby quilt (MU) Quilting and binding this one.
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt
17. Mug Rug (CA)

Binding still needs to be done
5. Green and Purple quilt (BW)
7. Judy L's bear in the woods. Needs to be done by the 20th (DB) Bind while waiting for DD.

Label still needs to be done
16. Batik Quilt (SG)

Finished
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11
11. quilt baby quilt (MU)
9. Girl Scout quilt. Needs to be done by the 18th. (EF)

8. Baby quilt (M)
17. Baby Quilt

Wednesday, May 11, 2011

Final update for the day.

Updated to do list

Piecing still needs to be done

1. RWB quilt (JC) (was an UFO)

2. Red quilt for teacher (JJ)
3. Red quilt for teacher (AC)
4. Red baby quilt (AC)
6. Pink and green quilt. Started, but not finished. (KB)

Quilting still needs to be done
12. quilt baby quilt (MU)
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt
17. Mug Rug (CA)

Binding still needs to be done
5. Green and Purple quilt (BW)
7. Judy L's bear in the woods. Needs to be done by the 20th (DB)

Label still needs to be done
16. Batik Quilt (SG)
9. Girl Scout quilt. Needs to be done by the 18th. (EF)

8. Baby quilt (M)
17. Baby Quilt

Finished
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11
11. quilt baby quilt (MU)

Another update

Updated to do list
I finished the binding on 2 quilts.  Now to get the labels done and sewn on.  They will be finished.  :)  I finished the top for one quilt.  I finished quilting another and will have the binding sewn on soon.  I'm making progress.

Piecing still needs to be done
2. Red quilt for teacher (JJ)
3. Red quilt for teacher (AC)
4. Red baby quilt (AC)
6. Pink and green quilt. Started, but not finished. (KB)

Quilting still needs to be done
12. quilt baby quilt (MU)
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt
17. Mug Rug (CA)
1. RWB quilt (JC) (was an UFO)

Binding still needs to be done
5. Green and Purple quilt (BW)
7. Judy L's bear in the woods. Needs to be done by the 20th (DB)

Label still needs to be done
16. Batik Quilt (SG)
 9. Girl Scout quilt. Needs to be done by the 18th. (EF)
8. Baby quilt (M)

Finished
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11
11. quilt baby quilt (MU)

Update

Updated to do list

Piecing still needs to be done
1. RWB quilt (JC) (was an UFO)
2. Red quilt for teacher (JJ)
3. Red quilt for teacher (AC)
4. Red baby quilt (AC)
6. Pink and green quilt. Started, but not finished. (KB)

Quilting still needs to be done
12. quilt baby quilt (MU)
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt
17. Mug Rug (CA)

Binding still needs to be done
5. Green and Purple quilt (BW)
7. Judy L's bear in the woods. Needs to be done by the 20th (DB)
8. Baby quilt (M)
9. Girl Scout quilt. Needs to be done by the 18th. (EF)
11. quilt baby quilt (MU)


Label still needs to be done
16. Batik Quilt (SG)

Finished
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11

Design Wall Monday on Wednesday

This is a teacher quilt and one of my UFOs, so it will do double duty for me.
My design wall is going to be changing lots this month.

If you want to see other design walls, check out Patchwork times.