Sunday, December 28, 2025

End of 2025 To-Do-List

I have not had a great year of finishes, but anything is better than nothing.

I doubt I finish anything else this year that is on this list, so I'm reporting a bit early the end of 2025.

My stashbuster numbers are 6/24, or 25%.

I'm still working on paperwork, but the big things are almost done.

1. Donna's Memory Quilts (4) 

First Top is done.
I might add borders, but I want to ensure enough fabric for the other quilts.
Three more to go.

2. Lillian's Memory Bears (10)

I have one started. I should just get them sewn.

3. Ashley High School Graduation Quilt

This quilt is VERY overdue.

COMPLETED Quilts

4. QOV (4)

One was already provided; it was a flag quilt.

 

I received another one that only needs binding added.
This is the last one that needs to be quilted.

At least one Stashbuster UFO a month (6/24) 25%

January #36 Thru Grandmother's Window

(This is all appliqué)

February #6 Wowza

I won't be able to show this because it is a test quilt that I had trouble with.

February #21 Wedding Quilt 

I don't like the design of this quilt, which makes it a challenge.

I might end up changing the color placements

March #9 Wool Poinsettia Ornaments
I'm working on the ornaments in the evenings.
I was missing beads, so I had to find some in my craft closet.
These are the next priority.
This ended up being half done.

April #3 Yo-Yos
This is an ongoing project.
I have an idea for a toy made from Yo-Yos.

April #39 Thread Catchers
I have sewn the ones I had prepped.
So if I can sit to sew, I might be able to sew to the point of hand sewing.
I'm still getting these prepped and will continue to work on them next year.

May #1 Zoology
This is a panel and should be quick to finish.
I just need to be able to sew.

May #15 Wildlife Panel Quilt
Another quick finish if I could get to it.

June #10 Woodsy Bag
This one has minimal left to do to complete it.
I need to focus more on it.

June #45 Texas Armadillo Table Runner 
I need to find this one to determine what's required to complete it.

July #4 Yellow & Blue Birthday Day Block Swap

July #29 Triple Irish Chain

August #12 Wolf Pack

August #68 Shashiko
This won't be done because I still have some pieces to work on.
This is an ongoing project.
I would like to utilize them in a larger project.

September #23 Vistas (use moongate jelly roll)

October #13 Winter Trees Placemats

November #52 Stormy Skies (Zen Quilter)
I don't know what this one is.

December#8 Woven Hearts

December#93 Randy's Patches

Completed Stashbuster UFOs 6/24(25%)

January #10 Wolf Postcard Wall Hanging

March #43
 The Continental

April #3 Yo-Yos

September #2 Zippered Pouches

 
October #5 Wyatt's Alphabet


November #7 Woven Snowflake Ornaments
Finished these and another set similar to them.

  All People Quilt UFOs 

At least 50% (4/12) 33%

January #4 Shelf Curtain

March #2 Donna's Memory Quilt

I have the top finished, but I am wondering if I want to add borders, so it will sit until I have a few more of these quilts made.

April #1 Lillian's Bears

I need to just put these together and finish them.

May #9 Gingerbread Wishes

This is a redwork project, and I'm working on it at night.

July #5 Oasis Cover

August # 8 Christmas Stocking

September #6 Arrowheads

November #3 Wowza

Completed APQ UFOs (3/6) (50%)

December #11 Jo's Retreat Teal & Brown

June #10 Hungry Little Caterpillar

 
February #7 Bright Rainbow Quilt

October #12 Shy Little Kitten