My to-do-list for 2024
It's been a slow month for completions.
The NBAQG QuiltFest took up most of my time.
Since that time, I have accomplished zero in September, and doubt there will be much more in October.
1. Donna's memory quilt or two, depending on how it goes together.
I have the second box and have started deconstructing it.
I think I have decided on at least one of the patterns.
3. I'd like to make some memory teddy bears from Rob, Lillian, and Donna's leftovers.
Lillian's bears are cut.
They will give me one more shirt next month to make the 10th bear.
I mixed up the fabrics and started one bear, but have not finished anything.
4. Wedding quilt
(This one may be delayed for a bit)
I have 5 of the one block done.
I need to make 4 of the second block to ensure this will work.
I don't know how big it will become.
5. Ashley's High School Graduation Quilt
All the T-shirts are deconstructed.
9. At least one of the Stashbuster UFO numbers each month (12/24 in the year)
Finished 8/16 (50%)
March #2 5-Pocket Pouches
I'm using these as leaders/enders to prepare all the pockets, and then I'll put them all together at once.
March #53 Christmas Trees
This will have more mug rugs made.
It really isn't Christmas trees.
I won't remove it from the list until I've used all the paper-pieced printouts.
April #19 is Bench Pillows/Door decorations/swatter sweaters
May #11 Ashley's HS Organization/Miscellaneous T-shirt Quilt
June #3 A Heritage Quilt
I'll take it with me on vacation and finish cutting.
Had a problem, so it is still not cut out.
July #10 Ashley Grocery Bags
I made lots of these, and then Ashley gave me more to make.
August #6 America's Pride
This is an applique project.
The applique is traced on the fusible.
There will be hand stitching after everything is fused.
I'll be taking this on the vacation.
August #34 Butterfly Bliss Panel
The panel is large and has been trimmed.
The border fabrics are picked, and some are cut.
I hope this one can be finished this month.
It wasn't and I am about ready to put it away until another time.
10. Complete 80% (9-10) of the All People Quilt Challenge projects.
Un-Finished 7/14 (50%)
March
#2 5-pocket Pouch
#53 Christmas Trees
April
#19 Bench Pillow/Monthly items (partially done)
May
#11 Ashley High School Organization & Misc Quilt
June
#3 A Heritage Quilt
July
#10 Ashley T-shirt Grocery Bags
Three more to make.
A black stabilizer was needed to finish this UFO.
But now DD added two more shirts to the pile.
See above.
Apparently, I need to make one more and I'll be done.
August
#8 Sweater Swatters
There are 12 of these, and some are done and some are not.
September
DONE in previous months #7 Jacob's Ladder
October
DONE in previous months #6 Flamingo
===================================
COMPLETED in ALL categories
You can see the January completions here.
You can see the February completions here.
You can see the March completions here.
You can see the April completions here.
You can see the May completions here.
You can see the June completions here.
You can see the July completions here.
August Completions:
No comments:
Post a Comment