Pages

Monday, May 30, 2011

Final update for today.

Sometimes I wish my brain would not think about additional things that need to be done.  :(
So, I decided there were 2, actually 4 more folks I wanted to do something for.  So, 2 are made and quilted.  They are small, so the binding won't take long and I am going to use a standard label that is already stitched out.  One will be some quilting items because I just found out that she was going to focus on learning more about quilting.  The last one, I'm not sure what I'm going to do for her.  Maybe just a gift card?

Quilting still needs to be done

13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt

Binding still needs to be done
4. Red baby quilt (AC) (made one and was not happy with the size, so I'm making this pattern instead. It is a disappearing 4 patch. Fairly easy and I'm making it scrappy like Mom's)  Almost completed
3. Red quilt for teacher (AC) This is the larger D4P (disappearing 4 patch) that is the Momma of the one from yesterday. Now to find backing and these these quilted. Already trimmed and binding sewn on.  Label is also made
2. Red quilt for teacher (JJ) Ready to trim.  Need to make binding and label.
19. May's Jo's club (MR) Ready to add binding.  This is a last minute addition.
20. May's Jo's club (SD) Ready to add binding. This is a last minute addition.

Label still needs to be done

Finished
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11
11. quilt baby quilt (MU) Mailed 5/14/11
9. Girl Scout quilt. Needs to be done by the 18th. (EF) UFO delivered 12 May 11
8. Baby quilt (M) Delivered 5/12/11
17. Baby Quilt (McC) Delivered 5/12/11
12. quilt baby quilt (MU) Quilting and binding this one. Mailed 5/14/11
7. Judy L's bear in the woods. Needs to be done by the 20th (DB) UFO 5/16/11
16. Batik Quilt (SG) UFO
5. Green and Purple quilt (BW)
1. RWB quilt (JC) (was an UFO)
18. Mug Rug (CA) UFO 5/28/11
6. Pink and green quilt. Started, but not finished. (KB) UFO 5/28/11

Almost there

Piecing still needs to be done ALL DONE, now to get the rest of them quilted.

I'm quilting away.  We went on a drive today and I almost got the baby quilt bound.  I have about 3 inches and the 2 sides of the label not on the edge.  I'm making progress.  Came home and quilted the Momma quilt.  That should have binding on it ready to stitch down in about an hour.  One more gift quilt that has to be done.  The QOVs and Angel Cover Ministry quilts probably won't get done this month, but will early next.


Quilting still needs to be done
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt
2. Red quilt for teacher (JJ)

Binding still needs to be done

4. Red baby quilt (AC) (made one and was not happy with the size, so I'm making this pattern instead. It is a disappearing 4 patch. Fairly easy and I'm making it scrappy like Mom's)
3. Red quilt for teacher (AC) This is the larger D4P (disappearing 4 patch) that is the Momma of the one from yesterday. Now to find backing and these these quilted.


Label still needs to be done

Finished
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11
11. quilt baby quilt (MU) Mailed 5/14/11
9. Girl Scout quilt. Needs to be done by the 18th. (EF) UFO delivered 12 May 11
8. Baby quilt (M) Delivered 5/12/11
17. Baby Quilt (McC) Delivered 5/12/11
12. quilt baby quilt (MU) Quilting and binding this one. Mailed 5/14/11
7. Judy L's bear in the woods. Needs to be done by the 20th (DB) UFO 5/16/11
16. Batik Quilt (SG) UFO
5. Green and Purple quilt (BW)
1. RWB quilt (JC) (was an UFO)
18. Mug Rug (CA) UFO 5/28/11
6. Pink and green quilt. Started, but not finished. (KB) UFO 5/28/11

Sunday, May 29, 2011

Fabric useage

Judy's stash report is what keeps me going.

My stash report for the week is:

Fabric usage goal (100 yards)--USED over 100 yards this year!
Fabric Added This Week --0.00 yards
Fabric Added Year to Date -- 11.00 yards
Fabric Used This Week -- 22.25 yards
Fabric Used Year to Date -- 100.09 yards
Fabric Used this month -- 37.79 yards

All Tops are pieced

Piecing still needs to be done  ALL DONE, now to get the rest of them quilted.


Quilting still needs to be done
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt
4. Red baby quilt (AC) (made one and was not happy with the size, so I'm making this pattern instead. It is a disappearing 4 patch. Fairly easy and I'm making it scrappy like Mom's)
3. Red quilt for teacher (AC) This is the larger D4P (disappearing 4 patch) that is the Momma of the one from yesterday. Now to find backing and these these quilted.
2. Red quilt for teacher (JJ)
Binding still needs to be done

Label still needs to be done

Finished
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11
11. quilt baby quilt (MU) Mailed 5/14/11
9. Girl Scout quilt. Needs to be done by the 18th. (EF) UFO delivered 12 May 11
8. Baby quilt (M) Delivered 5/12/11
17. Baby Quilt (McC) Delivered 5/12/11
12. quilt baby quilt (MU) Quilting and binding this one. Mailed 5/14/11
7. Judy L's bear in the woods. Needs to be done by the 20th (DB) UFO 5/16/11
16. Batik Quilt (SG) UFO
5. Green and Purple quilt (BW)
1. RWB quilt (JC) (was an UFO)
18. Mug Rug (CA) UFO 5/28/11
6. Pink and green quilt. Started, but not finished. (KB) UFO 5/28/11

One more top

I'm on to a red and blue quilt and that is the last that I must have done this month.


Piecing still needs to be done

2. Red quilt for teacher (JJ)

Quilting still needs to be done
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt
4. Red baby quilt (AC) (made one and was not happy with the size, so I'm making this pattern instead. It is a disappearing 4 patch. Fairly easy and I'm making it scrappy like Mom's)
3. Red quilt for teacher (AC)                 This is the larger D4P (disappearing 4 patch) that is the Momma of the one from yesterday.  Now to find backing and these these quilted.
Binding still needs to be done

Label still needs to be done

Finished
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11
11. quilt baby quilt (MU) Mailed 5/14/11
9. Girl Scout quilt. Needs to be done by the 18th. (EF) UFO delivered 12 May 11
8. Baby quilt (M) Delivered 5/12/11
17. Baby Quilt (McC) Delivered 5/12/11
12. quilt baby quilt (MU) Quilting and binding this one. Mailed 5/14/11
7. Judy L's bear in the woods. Needs to be done by the 20th (DB) UFO 5/16/11
16. Batik Quilt (SG) UFO
5. Green and Purple quilt (BW)
1. RWB quilt (JC) (was an UFO)
18. Mug Rug (CA) UFO 5/28/11
6. Pink and green quilt. Started, but not finished. (KB) UFO 5/28/11

Saturday, May 28, 2011

Piecing still needs to be done
2. Red quilt for teacher (JJ)
3. Red quilt for teacher (AC)

Quilting still needs to be done
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt
4. Red baby quilt (AC) (made one and was not happy with the size, so I'm making this pattern instead. It is a disappearing 4 patch. Fairly easy and I'm making it scrappy like Mom's)
Binding still needs to be done

Label still needs to be done

Finished
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/111. quilt baby quilt (MU) Mailed 5/14/11
9. Girl Scout quilt. Needs to be done by the 18th. (EF) UFO delivered 12 May 11
8. Baby quilt (M) Delivered 5/12/11
17. Baby Quilt (McC) Delivered 5/12/11
12. quilt baby quilt (MU) Quilting and binding this one. Mailed 5/14/11
7. Judy L's bear in the woods. Needs to be done by the 20th (DB) UFO 5/16/11
16. Batik Quilt (SG) UFO
5. Green and Purple quilt (BW)
1. RWB quilt (JC) (was an UFO)
18. Mug Rug (CA) UFO
6. Pink and green quilt. Started, but not finished. (KB) UFO 5/28/11

On top of all things, I had a class today.  I made this in class and started another one.  I really like it, but I wish I could use it for one of my projects!

Wednesday, May 25, 2011

To do List slowly going down

Piecing still needs to be done
2. Red quilt for teacher (JJ)
3. Red quilt for teacher (AC)



















4. Red baby quilt (AC) (made one and was not happy with the size, so I'm making this pattern instead.  It is a disappearing 4 patch.  Fairly easy and I'm making it scrappy like Mom's)

Quilting still needs to be done
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt
6. Pink and green quilt. Started, but not finished. (KB) UFO

Binding still needs to be done


Label still needs to be done
18. Mug Rug (CA) UFO

Finished

10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11
11. quilt baby quilt (MU) Mailed 5/14/11
9. Girl Scout quilt. Needs to be done by the 18th. (EF) UFO delivered 12 May 11
8. Baby quilt (M) Delivered 5/12/11
17. Baby Quilt (McC) Delivered 5/12/11
12. quilt baby quilt (MU) Quilting and binding this one. Mailed 5/14/11
7. Judy L's bear in the woods. Needs to be done by the 20th (DB) UFO 5/16/11
16. Batik Quilt (SG) UFO
5. Green and Purple quilt (BW)















1. RWB quilt (JC) (was an UFO)


 
 
 
 
 
 
 
 
 
 
 
I'm still working away.  Life got in my way and I had little energy to do much and lost most of a weekend.  But, I'm back on track to keep on plugging away.  I know what I'm doing on the last quilt.  I've got 6 blocks to make on the next one and they can go together and be ready to be quilted.  The items in blue are the ones I'll be working on today.

Sunday, May 22, 2011

Sunday report

Judy is the one to motivate us, and I so appreciate it. Been quilting, but have not updated much.
My stash report for the week is:

Fabric usage goal (100 yards)--(92.56)
Fabric Added This Week --0.00 yards
Fabric Added Year to Date -- 11.00 yards
Fabric Used This Week -- 14.73 yards
Fabric Used Year to Date -- 92.56 yards
Fabric Used this month -- 30.26 yards
Net fabric used year to date: (92.56) yards

I'm making progress, but did nothing this weekend.  Not a good weekend, so I will have to work harder in the next week and a half.  :(

Wednesday, May 18, 2011

a few things done

Piecing still needs to be done
2. Red quilt for teacher (JJ)
3. Red quilt for teacher (AC)

Quilting still needs to be done
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt
6. Pink and green quilt. Started, but not finished. (KB) UFO
4. Red baby quilt (AC)

Binding still needs to be done
1. RWB quilt (JC) (was an UFO)

Label still needs to be done
18. Mug Rug (CA) UFO

Finished
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11
11. quilt baby quilt (MU) Mailed 5/14/11
9. Girl Scout quilt. Needs to be done by the 18th. (EF) UFO delivered 12 May 11
8. Baby quilt (M) Delivered 5/12/11
17. Baby Quilt (McC) Delivered 5/12/11
12. quilt baby quilt (MU) Quilting and binding this one. Mailed 5/14/11
7. Judy L's bear in the woods. Needs to be done by the 20th (DB) UFO 5/16/11
16. Batik Quilt (SG) UFO
5. Green and Purple quilt (BW)

Had to make a bridge for the bridging ceremony for the last Girl Scout meeting.

Tuesday, May 17, 2011

To Do for Wed

Piecing still needs to be done
2. Red quilt for teacher (JJ)
3. Red quilt for teacher (AC)
4. Red baby quilt (AC)

Quilting still needs to be done
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt
6. Pink and green quilt. Started, but not finished. (KB) UFO

Binding still needs to be done
1. RWB quilt (JC) (was an UFO)

Label still needs to be done
18. Mug Rug (CA) UFO

Finished
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11
11. quilt baby quilt (MU) Mailed 5/14/11
9. Girl Scout quilt. Needs to be done by the 18th. (EF) UFO delivered 12 May 11
8. Baby quilt (M) Delivered 5/12/11
17. Baby Quilt (McC) Delivered 5/12/11
12. quilt baby quilt (MU) Quilting and binding this one. Mailed 5/14/11
7. Judy L's bear in the woods. Needs to be done by the 20th (DB) UFO 5/16/11
16. Batik Quilt (SG) UFO
5. Green and Purple quilt (BW)

another one done

This is from my Jo's Club and was called Sisters.  I didn't have a sister, so I didn't put that fabric in the center, instead I did a tiny log cabin.

Progress

Piecing still needs to be done
2. Red quilt for teacher (JJ)
3. Red quilt for teacher (AC)
4. Red baby quilt (AC)

Quilting still needs to be done
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt
6. Pink and green quilt. Started, but not finished. (KB) UFO
I really like the way this one turned out.

Binding still needs to be done
1. RWB quilt (JC) (was an UFO)

Label still needs to be done
17. Mug Rug (CA) UFO

Finished
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11
11. quilt baby quilt (MU) Mailed 5/14/11
9. Girl Scout quilt. Needs to be done by the 18th. (EF) UFO delivered 12 May 11
8. Baby quilt (M) Delivered 5/12/11
17. Baby Quilt (McC) Delivered 5/12/11
12. quilt baby quilt (MU) Quilting and binding this one. Mailed 5/14/11
7. Judy L's bear in the woods. Needs to be done by the 20th (DB) UFO 5/16/11
16. Batik Quilt (SG) UFO

5. Green and Purple quilt (BW)

Plans for Tuesday

Finished one label and will deliver that quilt today.
Ill be working on the ones in blue today, along with the GS bridge I need to put together.

Piecing still needs to be done
2. Red quilt for teacher (JJ)
3. Red quilt for teacher (AC)
4. Red baby quilt (AC)
6. Pink and green quilt. Started, but not finished. (KB) UFO

Quilting still needs to be done
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt

Binding still needs to be done
1. RWB quilt (JC) (was an UFO)
17. Mug Rug (CA) UFO

Label still needs to be done
16. Batik Quilt (SG) UFO
5. Green and Purple quilt (BW)

Finished
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11
11. quilt baby quilt (MU) Mailed 5/14/11
9. Girl Scout quilt. Needs to be done by the 18th. (EF) UFO delivered 12 May 11
8. Baby quilt (M) Delivered 5/12/11
17. Baby Quilt (McC) Delivered 5/12/11
12. quilt baby quilt (MU) Quilting and binding this one. Mailed 5/14/11
7. Judy L's bear in the woods. Needs to be done by the 20th (DB) UFO 5/16/11

Monday, May 16, 2011

Another quilt ready to label

Finished the binding on the green and purple quilt.  It is in the washer, and I'll take a photo when it is done.  I think it would be fun to have one post with all my fifteen quilts on it.  Maybe I can make that happen.  :)

I downloaded the files for the labels, so I'll be working on them tonight.

Piecing still needs to be done

2. Red quilt for teacher (JJ)
3. Red quilt for teacher (AC)
4. Red baby quilt (AC)
6. Pink and green quilt. Started, but not finished. (KB) UFO

Quilting still needs to be done
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt

Binding still needs to be done
1. RWB quilt (JC) (was an UFO)
17. Mug Rug (CA) UFO

Label still needs to be done
16. Batik Quilt (SG) UFO
7. Judy L's bear in the woods. Needs to be done by the 20th (DB) UFO
5. Green and Purple quilt (BW)


Finished
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11
11. quilt baby quilt (MU) Mailed 5/14/11
9. Girl Scout quilt. Needs to be done by the 18th. (EF) UFO delivered 12 May 11
8. Baby quilt (M) Delivered
17. Baby Quilt (McC) Delivered
12. quilt baby quilt (MU) Quilting and binding this one. Mailed 5/14/11

Desig Wall Monday


Judy has us showing what is on our design wall.  This pineapple blossom is on my main design wall.  I don't like the sashing, so I need to figure out something else.
 This red and white quilt is from Marge Gordon's Delaware quilts.  I'm making two of this pattern and finished the blocks on this one.  Need to press all the hst and get them arranged around the edge.  This is on my portable design wall that I took to my small group yesterday.
I am making progress on my list of quilts, and hope to have some finishes soon.

Fabric useage

Judy is the one to motivate us, and I so appreciate it. Been quilting, but have not updated much.


My stash report for the week is:
Fabric usage goal (100 yards)--(62.14)
Fabric Added This Week --11.00 yards
Fabric Added Year to Date -- 11.00 yards
Fabric Used This Week -- 6.91 yards
Fabric Used Year to Date -- 80.21 yards
Fabric Used this month -- 6.91 yards
Net fabric used year to date: (69.21) yards

I have been busy and have actually used many of my UFOs.
I finished this Bear in the Woods that I didn't quite finish all the way, but it is the size I needed.
This patriotic blue quilt was a 2008 UFO that was a birthday block swap that I didn't do anything with.  Now it will be a teacher quilt.  it is quilted and the binding is in process.
This group of quilts had a GS quilt as another UFO and some strips from my scraps.  I also quilted for some others.
The dear jane was a UFO that was not mine.  No fabric used, but lots of thread was used.

So, I'm making progress on my quilts that need finished by the end of the month.

I have 2 that are ready to put together, so now I need to do that.  :)

I also need to work on the labels.  They are all digitized and ready to stitch out.

Saturday, May 14, 2011

Progress made

Piecing still needs to be done
2. Red quilt for teacher (JJ)
3. Red quilt for teacher (AC)
4. Red baby quilt (AC)
6. Pink and green quilt. Started, but not finished. (KB) UFO

Quilting still needs to be done
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt

Binding still needs to be done
5. Green and Purple quilt (BW) (working on this binding while waiting)
1. RWB quilt (JC) (was an UFO)
17. Mug Rug (CA) UFO


Label still needs to be done
16. Batik Quilt (SG) UFO
7. Judy L's bear in the woods. Needs to be done by the 20th (DB) UFO

Finished
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11
11. quilt baby quilt (MU) Mailed 5/14/11
9. Girl Scout quilt. Needs to be done by the 18th. (EF)UFO delivered 12 May 11
8. Baby quilt (M) Delivered
17. Baby Quilt (McC) Delivered
12. quilt baby quilt (MU) Quilting and binding this one. Mailed 5/14/11

One more finish

This was a Patchwork times quilt.  I did stop one border short of what she did, but the size was what I wanted.
It washed up lovely.

Friday, May 13, 2011

photos

This quilt was made by Marianne and i quilted the aliens in my neon green and black thread.  It was fun to quilt.

This is one of my UFOs from 2008.  It will become a teacher quilt for the end of school.  I'm loading it on the long arm tonight.

Next I need to work on getting another quilt pieced and ready to quilt.  Must have one in the binding stage at all times and one ready for when that is done.  Makes waiting easier and makes me feel more productive.  LOL

Update

Semi slow day today.  Had lots of school activities.  But, I did bind a quilt while in a meeting.  Started the next binding and am about half done.  Now, I think I'll load a quilt and hopefully get it quilted tomorrow.

Piecing still needs to be done
2. Red quilt for teacher (JJ)
3. Red quilt for teacher (AC)
4. Red baby quilt (AC)
6. Pink and green quilt. Started, but not finished. (KB) UFO

Quilting still needs to be done
1. RWB quilt (JC) (was an UFO)
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt
17. Mug Rug (CA) UFO

Binding still needs to be done
5. Green and Purple quilt (BW) (working on this binding while waiting)

Label still needs to be done
16. Batik Quilt (SG) UFO
7. Judy L's bear in the woods. Needs to be done by the 20th (DB) UFO

Finished
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11
11. quilt baby quilt (MU)
9. Girl Scout quilt. Needs to be done by the 18th. (EF)UFO
8. Baby quilt (M)
17. Baby Quilt
12. quilt baby quilt (MU) Quilting and binding this one.

Thursday, May 12, 2011

Plans for today.

Piecing still needs to be done

1. RWB quilt (JC) (was an UFO) putting the border on this one
2. Red quilt for teacher (JJ)
3. Red quilt for teacher (AC)
4. Red baby quilt (AC)
6. Pink and green quilt. Started, but not finished. (KB)

Quilting still needs to be done
12. quilt baby quilt (MU) Quilting and binding this one.
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt
17. Mug Rug (CA)

Binding still needs to be done
5. Green and Purple quilt (BW)
7. Judy L's bear in the woods. Needs to be done by the 20th (DB) Bind while waiting for DD.

Label still needs to be done
16. Batik Quilt (SG)

Finished
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11
11. quilt baby quilt (MU)
9. Girl Scout quilt. Needs to be done by the 18th. (EF)

8. Baby quilt (M)
17. Baby Quilt

Wednesday, May 11, 2011

Final update for the day.

Updated to do list

Piecing still needs to be done

1. RWB quilt (JC) (was an UFO)

2. Red quilt for teacher (JJ)
3. Red quilt for teacher (AC)
4. Red baby quilt (AC)
6. Pink and green quilt. Started, but not finished. (KB)

Quilting still needs to be done
12. quilt baby quilt (MU)
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt
17. Mug Rug (CA)

Binding still needs to be done
5. Green and Purple quilt (BW)
7. Judy L's bear in the woods. Needs to be done by the 20th (DB)

Label still needs to be done
16. Batik Quilt (SG)
9. Girl Scout quilt. Needs to be done by the 18th. (EF)

8. Baby quilt (M)
17. Baby Quilt

Finished
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11
11. quilt baby quilt (MU)

Another update

Updated to do list
I finished the binding on 2 quilts.  Now to get the labels done and sewn on.  They will be finished.  :)  I finished the top for one quilt.  I finished quilting another and will have the binding sewn on soon.  I'm making progress.

Piecing still needs to be done
2. Red quilt for teacher (JJ)
3. Red quilt for teacher (AC)
4. Red baby quilt (AC)
6. Pink and green quilt. Started, but not finished. (KB)

Quilting still needs to be done
12. quilt baby quilt (MU)
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt
17. Mug Rug (CA)
1. RWB quilt (JC) (was an UFO)

Binding still needs to be done
5. Green and Purple quilt (BW)
7. Judy L's bear in the woods. Needs to be done by the 20th (DB)

Label still needs to be done
16. Batik Quilt (SG)
 9. Girl Scout quilt. Needs to be done by the 18th. (EF)
8. Baby quilt (M)

Finished
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11
11. quilt baby quilt (MU)

Update

Updated to do list

Piecing still needs to be done
1. RWB quilt (JC) (was an UFO)
2. Red quilt for teacher (JJ)
3. Red quilt for teacher (AC)
4. Red baby quilt (AC)
6. Pink and green quilt. Started, but not finished. (KB)

Quilting still needs to be done
12. quilt baby quilt (MU)
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt
17. Mug Rug (CA)

Binding still needs to be done
5. Green and Purple quilt (BW)
7. Judy L's bear in the woods. Needs to be done by the 20th (DB)
8. Baby quilt (M)
9. Girl Scout quilt. Needs to be done by the 18th. (EF)
11. quilt baby quilt (MU)


Label still needs to be done
16. Batik Quilt (SG)

Finished
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11

Design Wall Monday on Wednesday

This is a teacher quilt and one of my UFOs, so it will do double duty for me.
My design wall is going to be changing lots this month.

If you want to see other design walls, check out Patchwork times.

Tuesday, May 10, 2011

To Do list

I'm going to keep myself honest and track my progress by what still needs to be accomplished.  Maybe this way I can see they are getting done.  If I can get the piecing done before the middle of the month, it will be a piece of cake.  Right?

Piecing still needs to be done
1. RWB quilt (JC) (was an UFO)
2. Red quilt for teacher (JJ)
3. Red quilt for teacher (AC)
4. Red baby quilt (AC)
6. Pink and green quilt. Started, but not finished. (KB)

Quilting still needs to be done
11. quilt baby quilt (MU)
12. quilt baby quilt (MU)
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt
17.  Mug Rug (CA)


Binding still needs to be done
5. Green and Purple quilt (BW)
7. Judy L's bear in the woods. Needs to be done by the 20th (B)
8. Baby quilt (M)
9. Girl Scout quilt needs  Needs to be done by the 18th. (EF)

Label still needs to be done
16.  Batik Quilt (SG)

Finished
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11

Monday, May 9, 2011

Dear Jane is quilted

This quilt was embroidered by a dear friend of mine, Vicki.  I've had it for a long time because it scared me to quilt it.  But, I finally had someone suggest stippling between the blocks to outline them.  Then, I did feathers in the wedges.  I like it.  It feels good to have it done.

So, now I have one less on my to do list.
1. RWB quilt for teacher just needs pieced and quilted.

2. Red quilt for teacher (not giving names in case they see this)
3. Red quilt for teacher
4. Red baby quilt
5. Green and Purple quilt just needs quilting. It is pieced.
6. Pink and green quilt. Started, but not finished.
7. Judy L's bear in the woods needs quilting. Needs to be done by the 20th
8. Baby quilt needs binding and label
9. Girl Scout quilt needs binding and label. Need to be done by the 18th.
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11
11. quilt baby quilt
12. quilt baby quilt
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt

Sunday, May 8, 2011

Too Busy

well, it has been a long time since I've posted anything.

so, I decided on Mother's Day I would.  :)

Hope all Moms have a wonderful day!

I have spent most of April helping my Mom and Dad because of Mom's fall and breaking her shoulder/arm.  so, life has been a bit crazy.

It is coming to the end of the school year and I am really having a load of problems.  I have too many quilts to finish.

This is what is going on.
I need the following quilts done by the 2nd of June.
1. RWB quilt for teacher just needs pieced and quilted.
2. Red quilt for teacher (not giving names in case they see this)
3. Red quilt for teacher
4. Red baby quilt
5. Green and Purple quilt just needs quilting.  It is pieced.
6. Pink and green quilt.  Started, but not finished.
7. Judy L's bear in the woods needs quilting. Needs to be done by the 20th
8. Baby quilt needs binding and label
9. Girl Scout quilt needs binding and label. Need to be done by the 18th.
10. Quilt Dear Jane that I've had too long.  It is in process, but it taking a bobbin of thread per pass.  Yikes!
11.  quilt baby quilt
12. quilt baby quilt
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt

No photos right now because I can't find my battery charger and it won't let me take any photos or download them.  :(

I will be focused and should have plenty of stash usage to report.

I did make water bottle holders for teacher appreciation week. (can't get the photo to turn.)

So, if I'm missing action, I'm busy with the end of school activities and quilting.  I hope.