Quilting still needs to be done
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt4. Red baby quilt (AC) (made one and was not happy with the size, so I'm making this pattern instead. It is a disappearing 4 patch. Fairly easy and I'm making it scrappy like Mom's)
3. Red quilt for teacher (AC) This is the larger D4P (disappearing 4 patch) that is the Momma of the one from yesterday. Now to find backing and these these quilted.
2. Red quilt for teacher (JJ)
Binding still needs to be done10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11
11. quilt baby quilt (MU) Mailed 5/14/11
9. Girl Scout quilt. Needs to be done by the 18th. (EF) UFO delivered 12 May 11
8. Baby quilt (M) Delivered 5/12/11
17. Baby Quilt (McC) Delivered 5/12/11
12. quilt baby quilt (MU) Quilting and binding this one. Mailed 5/14/11
7. Judy L's bear in the woods. Needs to be done by the 20th (DB) UFO 5/16/11
16. Batik Quilt (SG) UFO
5. Green and Purple quilt (BW)
1. RWB quilt (JC) (was an UFO)
18. Mug Rug (CA) UFO 5/28/11
6. Pink and green quilt. Started, but not finished. (KB) UFO 5/28/11
No comments:
Post a Comment