Pages

Wednesday, August 7, 2019

Update from trip


This is the updated status of my August commitments.
Note: this is the same list I've been using, so the changes are in a different color.
So many things to be done in August.

DONE 1. Quilt previous test quilt and get it ready to take on the trip a week from Sunday to bind in the car. 
(ready for the trip)
(we are back from the trip and Interwoven is bound and on my bed)

DONE 2. Test quilt to be done by the 10th 
(finished the top, so I'm OK. I don't have to have it quilted)

3. Food embroidery should be done mid August. 
(I'm taking on the trip and don't see a problem with getting it done in August)
(Finished one of the columns while on trip, 2 more to go)

4. Baby Clothing quilt done by mid/late August.
(This one is the kicker because of how time consuming it is)
(Made a few more of the 16 patches while on trip 32 made)

5. 2 Clemens T-shirt quilts to be done by mid August
(One is stabilized, cut out and sashing and border cut.)
First one is no problem to finish)

DONE 6. 2009 NYE Mystery to be done by end of August.
(It is quilted and ready for the car.)
(It is quilted and ready for label)

3/6 of the projects are completed.
The biggest one is not completed, so there is still lots of work to do.


No comments:

Post a Comment