February - #10 Orphan Blocks
March - #4 Tie One On
June - #9 Christmas Embroidery
July - #12 Pink Horse Quilt
June - #10 yo yos
July - #1 Christmas diagonal
August - #9 Night Watch
January -#2 A Heritage Quilt
February - #109 Mr T
April - #101 - Miscellaneous Panels
May - #11 Bird of Paradise table runner
May - #111 Night Watch
June - #7 Ann's NYE Mystery
top is done
Need to quilt it in the near future.
June - #64 Food Embroidery
Finally figure out how I wanted to set the blocks.
I'm working on it as a leader/ender.
Working on HST and Clue #3 right now.
June - #107 Mother's & Angels Embroidery
July - #4 Acorn Squash Tablerunner
July - #42 Courthouse steps panel
August - #6 animal embroidery
August - #106 Mod Messenger Bag II
June - Zippered Bags
July - Baby clothing quilt
August - Baby clothing Quilt top
Finish-A-Long Q3
1. Baby Clothing - Girl Quilt
This girl baby clothing quilt needs to be finished.
I have stabilized and cut most of the clothing, and now need to sew them together.
I'll be starting with 16 patches and then assembling them.
DONE July 2. Acorn Squash Table Runner
The top is done, so it needs quilting and binding.
DONE July3. Tutti Frutti
This is from a class I took with Gail Garber.
It is finished.
DD helped me figure out what I wanted to do.
4. Coasters
This is a sample photo of coasters I need to make.
I need seasonal coasters made.
The batting is cut.
Some of the squares are cut.
5. Baby Clothing Boy Quilt
The top is done, but the girl one (it's for twins) needs done before this one.
Wish I'd known that before I started the boy one first. LOL
I just need to get the backing and quilt this one.
6. Ann's 2009 NYE Mystery
I'm making progress on this quilt.
It's 10 years old and I'd love to get it done.
That's quite a list! Good luck with moving all your projects to the completed list this year.
ReplyDeleteThanks for linking up with Elm Street Quilts One Monthly Goal and good luck with your project.
ReplyDelete