Pages

Monday, February 5, 2018

Motivational Monday

29 January - 3 February 2018

1. WITB
Had some quilting books in the box and found some fabric in there.
I filed the paperwork and all is well.

2. Keep working on the studio
Clear and clean cutting table and pressing table.
Pressing table only has the T-shirt pieces needing the framing.


Cutting table does not look clean clean, but it only has things on it I'm using right now.
I have no wall space to hang my rulers, so the area always look messy.

3. Continue shadowing for T-shirts
Can you tell the one frame that is different from the others? 
I have a few more to frame in that fabric and we will see what happens to the whole quilt.
I need a bigger design wall. LOL

4. Organization Challenge
Continue with the blue fabric drawers.
This is the bag of blue scraps that still needs to be sorted. 
  
One drawer empty and the dark drawer        Light and medium drawers. 
February color is purple and I only have one drawer.
This is it so far.

5. Quilt Imperfect Squares
Not touched

6. Work on Alphabet quilt
Snowball the corners


7. Start on Test quilt
Decided on the fabric for the Test Quilt for TQPM.

8. Continue to work on Test quilt for Tammy.
Have finished 2 of the rows.
I can't show the test quilt progress because it has not been released yet.


4-10 February 2018

1. WITB

2. Keep working on the studio
Pick a cabinet and clean it out.
I think it is going to be one of the lower cabinets in my area.
I think I have saved too many plastic baggies from finishing UFOs.

3. Continue shadowing for T-shirts

4. Organization Challenge
Continue with the blue fabric drawers.
Continue working with the purple drawer.

5. Quilt Imperfect Squares

6. Work on Alphabet quilt
Put top together.

7. Start on Test quilt
Cut out TQPM test quilt

8. Continue to work on Test quilt for Tammy.

No comments:

Post a Comment