15-21 January 2018
2. Keep working on the studio
Work on some flat surfaces
It Still looks cluttered, but feels lots less cluttered on that side.
I could use more work on flat surfaces.
3. Continue borders for T-shirts
4. Organization Challenge
Continue with the blue fabric drawers
5. Quilt Winter Solstice
DONE
6. Finish fall block table runner
DONE
It Still looks cluttered, but feels lots less cluttered on that side.
I could use more work on flat surfaces.
1, WITB
I found photos from our summer trip with the Girl Scouts.
I learned how to scan them all using my new scanner.
3. Continue borders for T-shirts
I'm still framing and laying out the quilt.
I ran out of the frame fabric.
I ordered some, hoping it will blend well enough.
4. Organization Challenge
Continue with the blue fabric drawers
It is taking longer because I am sorting light, medium, dark.
But, I'm making progress.
5. Quilt Winter Solstice
DONE
6. Finish fall block table runner
DONE
22--28 January 2018
1. WITB
2. Keep working on the studio
Continue to work on the flat surfaces
3. Continue shadowing for T-shirts
4. Organization Challenge
Continue with the blue fabric drawers
5. Quilt Imperfect Squares
6. Work on Alphabet quilt
Snowball the corners
7. Finish Flower pincushions
8. Quilt imperfect squares
This comment has been removed by a blog administrator.
ReplyDelete