The wedding quilt is in top stage.
I have the backing fabric and binding fabric.
I will work on that tomorrow.
The QOV is on the long arm.
I'm doing a large leaf pattern on the outside border
And a smaller swirl in the white.
About half way done.
Hoping to get it done tomorrow before the YOSA concert.
DD is playing at the Tobin Center, San Antonio.
No comments:
Post a Comment