I found a site that has printable coupons for JoAnns (and other stores).
Today there are 3 for Joann's, a 40% good until tonight, a 40% good until Sept 6, and a 10% off total purchase good for the Labor day weekend.
http://www.wow-coupons.com/all-printable-retail-coupons.php
Pages
▼
Sunday, August 31, 2008
Sunday, August 24, 2008
Feels good to quilt
What I've been doing
I've been working on her birthday party and then DS decided to have his on the same day, which was OK, but meant 2 different cakes.
We had about 25 folks attend and it was a swimming party, so they had lots of fun. DD prayed all week that it wouldn't rain on her birthday party.
Prayers are answered -- it was raining in the morning, then cleared up around 0900 and the party went from 1000 - 1200. It started to rain about 1215. LOL THANK YOU LORD!!! We stayed after and played in the pool in the rain. No thunder, until about 1300 and then we got out and went home.
Next birthday is in about 2 weeks for DH. I get them all out of the way in short order.
School starts tomorrow, so it will be back to the normal routine.
I've got lots of things I need to figure out what to do with. Next week will be volunteering in school for some of the time, and then we can focus on what I want to do.
Sunday update
Fabric usage goal --100 yards {25.23 to go}
Fabric Added This Week - 0 yards
Fabric Added Year to Date - 49.31 yards
Fabric Used This Week - 0 yards
Fabric Used Year to Date - 114.19 yards
Fabric Used this Month - -19.63 yards
Net year to date: 74.77 yards USED this year!!! (I'm still in the positive, Whew)
Thanks, Judy. So, what did I work on this week? absolutely nothing. I've been preparing for two birthday parties and still vacationing, so absolutely no sewing done this week. :( I should be better in the coming week.
Fabric Added This Week - 0 yards
Fabric Added Year to Date - 49.31 yards
Fabric Used This Week - 0 yards
Fabric Used Year to Date - 114.19 yards
Fabric Used this Month - -19.63 yards
Net year to date: 74.77 yards USED this year!!! (I'm still in the positive, Whew)
Thanks, Judy. So, what did I work on this week? absolutely nothing. I've been preparing for two birthday parties and still vacationing, so absolutely no sewing done this week. :( I should be better in the coming week.
Tuesday, August 19, 2008
Sunday Update a bit late
Fabric usage goal --100 yards {25.23 to go}
Fabric Added This Week - 0 yards (given to me as a gift)
Fabric Added Year to Date - 49.31 yards
Fabric Used This Week - .18 yards
Fabric Used Year to Date - 114.19 yards
Fabric Used this Month - -19.63 yards
Net year to date: 74.77 yards USED this year!!! (I'm still in the positive, Whew)
Thanks, Judy. So, what did I work on this week?
We've been vacationing the last 2 weeks, so not much sewing getting done. I've made some yoyos, but they don't count until they are in a project. :)
I did make one thread catcher during this time.
Fabric Added This Week - 0 yards (given to me as a gift)
Fabric Added Year to Date - 49.31 yards
Fabric Used This Week - .18 yards
Fabric Used Year to Date - 114.19 yards
Fabric Used this Month - -19.63 yards
Net year to date: 74.77 yards USED this year!!! (I'm still in the positive, Whew)
Thanks, Judy. So, what did I work on this week?
We've been vacationing the last 2 weeks, so not much sewing getting done. I've made some yoyos, but they don't count until they are in a project. :)
I did make one thread catcher during this time.
Wednesday, August 13, 2008
Vactioning
Why haven't I been posting? Because I've not been home to post. LOL We have been vacationing. I'm worn out. I'll show you what we've been up to.
Our trip started off at Schlitterbahn, New Braunfels, TX. Thank goodness DS went with us. I don't know that I'd be able to keep up with DD in the water.
Next was a visit to Sea World. DH doesn't ride on the roller coasters, so it was DD and me. DS couldn't go with us because he was working.
The next major event was a trip to Corpus Christi, TX. DS went along and was a life saver during this trip too.
We went to see the USS Lexington
I put them both in the brig when they got out of hand. :) DS having fun around the airplanes.Here we are, don't I look worn out already????
The Texas State Aquarium The kids playing around in a bubble of fish. DD waiting to see the dolphins. DD getting DS to hold a sea urchin. Look at that face. LOL
We took the long trip down to the tip of Texas to South Padre Island, TX to the Schlitterbahn there. That was a LONG day to drive down, play at Schlitterbahn and drive back to the Naval Air Station at Corpus Christi. We were all worn out from that trip.
I tied this fleece throw for DD for her birthday. I did work on yoyos on the trip down and back. Didn't get lots done because I napped.
I've been sewing on the BQ Mystery and Ann's Mystery. I still have 3 - 3" blocks to finish for the BQ Mystery. I am ready to sew the top together on Ann's Mystery. This was 100% from my 5" scrap drawer. I've used most of my nickles up. Yeah! Now to find the borders to finish it off.
Tomorrow I might get DH to go to the River Walk. We've been talking about it all summer.
Our trip started off at Schlitterbahn, New Braunfels, TX. Thank goodness DS went with us. I don't know that I'd be able to keep up with DD in the water.
Next was a visit to Sea World. DH doesn't ride on the roller coasters, so it was DD and me. DS couldn't go with us because he was working.
The next major event was a trip to Corpus Christi, TX. DS went along and was a life saver during this trip too.
We went to see the USS Lexington
I put them both in the brig when they got out of hand. :) DS having fun around the airplanes.Here we are, don't I look worn out already????
The Texas State Aquarium The kids playing around in a bubble of fish. DD waiting to see the dolphins. DD getting DS to hold a sea urchin. Look at that face. LOL
We took the long trip down to the tip of Texas to South Padre Island, TX to the Schlitterbahn there. That was a LONG day to drive down, play at Schlitterbahn and drive back to the Naval Air Station at Corpus Christi. We were all worn out from that trip.
I tied this fleece throw for DD for her birthday. I did work on yoyos on the trip down and back. Didn't get lots done because I napped.
I've been sewing on the BQ Mystery and Ann's Mystery. I still have 3 - 3" blocks to finish for the BQ Mystery. I am ready to sew the top together on Ann's Mystery. This was 100% from my 5" scrap drawer. I've used most of my nickles up. Yeah! Now to find the borders to finish it off.
Tomorrow I might get DH to go to the River Walk. We've been talking about it all summer.
Wednesday, August 6, 2008
Update
Well, this is vacation week, so I'm not around lots. Yesterday was a day at the Schlitterbahn Waterpark. Talk about being tired.
I was at a quilting retreat in Rockport this weekend and had a blast. I'm posting some photos from there. DD sent along Blue River (the hippo) to be with me so I wouldn't be lonely.
We all worked on the kit for the retreat and it was from the Fat Quarter Five Book. Look at all the differences.This is my green monster. LOL I decided to use my own fabrics and make it larger. So, I have double the blocks in this one. It fits the top of my King sized bed.
This is from the same kit as a couple of the ladies did, but a different book. I'm not sure which book it was.