Friday, September 30, 2011

Bastrop Fire Quilts





Project Linus from the Quilt Haus is providing quilts for the Bastrop, TX fire victims.  I'm helping to quilt them.

Misc Quiltings

Mary asked me to quilt one of her UFOs, a beautiful Fall tablerunner.

A quilt that will go to one of the charities.

A quilt that Tammy asked me to send to a flood victim.  This is one of the quilts for an entire family

Tammy Asked for this one to be quilted quickly.  the orange quilt.

Angel Cover Ministries

Not posted in a long time, but I have been doing things.  Lost the last post, but I'm going to break these down to my activities.
This quilt is to go to Angel Cover Ministries.  They don't have a machine large enough for some quilts.  Finally got it done, and now need to get it delivered.

Tuesday, August 23, 2011

Finally did something

I finally made a start at quilting again.  I quilted one for a customer, but I'm not sure I can post a photo of it, sooooo.
Marge Gordon of Delaware Quilts sent me these little quilts for the project at Wilford Hall Medical Center.  This is the place where they allow Moms that lose their babies to choose from items.  I put quilts in there for their use.  I've put 30 in so far and they are all given out.  How sad is that?  I finished these 3 today. . 

 One has been delivered and I'll pass the other two off next time I see my contact.  I actually have one more quilted and need to finish that binding.

This is the last project I finished for Jo's Club.  It still needs to be quilted, and I'm not sure how I am going to do that.  These are 1" unfinished logs.  Yikes!


This is QOV #98 that I finished this week.   
I have 1 more customer table runner to do and 4 more quilts to quilt.  I've already got the backing done, so it is just the loading of the quilts and quilting them. 
It feels good to be in the groove again.

Friday, August 5, 2011

Slowly getting back

I have been working on getting back into the swing of things, but it is a slow go.  Can't get the camera to download one UFO that I finished.  Hoping DS can help me with that soon.
Other than that, I have been so extremely tired that I've not accomplished much at one time.
Just found out that I have a virus that take 6-8 weeks to go away.  Hopefully it is going to go sometime soon!

Saturday, June 4, 2011

Taking it easy

I have to admit, I'm taking a breather.  I did do a larger sized speed strip quilt, but decided to cut it down and border it.  so, I'm getting 4 little quilts out of the one.  All the prints were novelty prints, so it only makes sense for them to be baby quilts.

I have a fun quilt to quilt for a neighbor.  Hopefully will get it loaded tonight and quilted tomorrow.

DH goes to the airport today and then it will be lonely and we will need something to do.

Wednesday, June 1, 2011

FINISHED

I didn't get the 3 charity quilts quilted this month, but I did finish the ones I needed.  So, here is the summary!

Quilting still needs to be done

13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt
This is the one that I made, but didn't like the size, so I had to do something different. This still needs to be quilted.











Finished
4. Red baby quilt (AC) (made one and was not happy with the size, so I'm making this pattern instead. It is a disappearing 4 patch. Fairly easy and I'm making it scrappy like Mom's) Almost completed















3. Red quilt for teacher (AC) This is the larger D4P (disappearing 4 patch) that is the Momma of the one from yesterday. Now to find backing and these these quilted. Already trimmed and binding sewn on. Label is also made

 

20. May's Jo's club (SD) Ready to add binding. This is a last minute addition.

 

On top of everything else, DD graduated 6th grade.

18. Mug Rug (CA) UFO 5/28/11


5. Green and Purple quilt (BW)


 
1. RWB quilt (JC) (was an UFO)

 

Finished the rainbow bridge for Girl Scouts

7. Judy L's bear in the woods. Needs to be done by the 20th (DB) UFO 5/16/11



 
12. quilt baby quilt (MU) Quilting and binding this one. Mailed 5/14/11




 
11. quilt baby quilt (MU) Mailed 5/14/11


17. Baby Quilt (McC) Delivered 5/12/11


19. May's Jo's club (MR) Ready to add binding. This is a last minute addition.



9. Girl Scout quilt. Needs to be done by the 18th. (EF) UFO delivered 12 May 11


8. Baby quilt (M) Delivered 5/12/11


10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11



 
16. Batik Quilt (SG) UFO


Ended up making these water bottle carriers too.

 
6. Pink and green quilt. (KB) UFO 5/28/11










2. Red quilt for teacher (JJ)
This is in the washer and ready to dry.  I'll post when all is done.