Tuesday, August 23, 2011

Finally did something

I finally made a start at quilting again.  I quilted one for a customer, but I'm not sure I can post a photo of it, sooooo.
Marge Gordon of Delaware Quilts sent me these little quilts for the project at Wilford Hall Medical Center.  This is the place where they allow Moms that lose their babies to choose from items.  I put quilts in there for their use.  I've put 30 in so far and they are all given out.  How sad is that?  I finished these 3 today. . 

 One has been delivered and I'll pass the other two off next time I see my contact.  I actually have one more quilted and need to finish that binding.

This is the last project I finished for Jo's Club.  It still needs to be quilted, and I'm not sure how I am going to do that.  These are 1" unfinished logs.  Yikes!


This is QOV #98 that I finished this week.   
I have 1 more customer table runner to do and 4 more quilts to quilt.  I've already got the backing done, so it is just the loading of the quilts and quilting them. 
It feels good to be in the groove again.

Friday, August 5, 2011

Slowly getting back

I have been working on getting back into the swing of things, but it is a slow go.  Can't get the camera to download one UFO that I finished.  Hoping DS can help me with that soon.
Other than that, I have been so extremely tired that I've not accomplished much at one time.
Just found out that I have a virus that take 6-8 weeks to go away.  Hopefully it is going to go sometime soon!

Saturday, June 4, 2011

Taking it easy

I have to admit, I'm taking a breather.  I did do a larger sized speed strip quilt, but decided to cut it down and border it.  so, I'm getting 4 little quilts out of the one.  All the prints were novelty prints, so it only makes sense for them to be baby quilts.

I have a fun quilt to quilt for a neighbor.  Hopefully will get it loaded tonight and quilted tomorrow.

DH goes to the airport today and then it will be lonely and we will need something to do.

Wednesday, June 1, 2011

FINISHED

I didn't get the 3 charity quilts quilted this month, but I did finish the ones I needed.  So, here is the summary!

Quilting still needs to be done

13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt
This is the one that I made, but didn't like the size, so I had to do something different. This still needs to be quilted.











Finished
4. Red baby quilt (AC) (made one and was not happy with the size, so I'm making this pattern instead. It is a disappearing 4 patch. Fairly easy and I'm making it scrappy like Mom's) Almost completed















3. Red quilt for teacher (AC) This is the larger D4P (disappearing 4 patch) that is the Momma of the one from yesterday. Now to find backing and these these quilted. Already trimmed and binding sewn on. Label is also made

 

20. May's Jo's club (SD) Ready to add binding. This is a last minute addition.

 

On top of everything else, DD graduated 6th grade.

18. Mug Rug (CA) UFO 5/28/11


5. Green and Purple quilt (BW)


 
1. RWB quilt (JC) (was an UFO)

 

Finished the rainbow bridge for Girl Scouts

7. Judy L's bear in the woods. Needs to be done by the 20th (DB) UFO 5/16/11



 
12. quilt baby quilt (MU) Quilting and binding this one. Mailed 5/14/11




 
11. quilt baby quilt (MU) Mailed 5/14/11


17. Baby Quilt (McC) Delivered 5/12/11


19. May's Jo's club (MR) Ready to add binding. This is a last minute addition.



9. Girl Scout quilt. Needs to be done by the 18th. (EF) UFO delivered 12 May 11


8. Baby quilt (M) Delivered 5/12/11


10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11



 
16. Batik Quilt (SG) UFO


Ended up making these water bottle carriers too.

 
6. Pink and green quilt. (KB) UFO 5/28/11










2. Red quilt for teacher (JJ)
This is in the washer and ready to dry.  I'll post when all is done.



Monday, May 30, 2011

Final update for today.

Sometimes I wish my brain would not think about additional things that need to be done.  :(
So, I decided there were 2, actually 4 more folks I wanted to do something for.  So, 2 are made and quilted.  They are small, so the binding won't take long and I am going to use a standard label that is already stitched out.  One will be some quilting items because I just found out that she was going to focus on learning more about quilting.  The last one, I'm not sure what I'm going to do for her.  Maybe just a gift card?

Quilting still needs to be done

13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt

Binding still needs to be done
4. Red baby quilt (AC) (made one and was not happy with the size, so I'm making this pattern instead. It is a disappearing 4 patch. Fairly easy and I'm making it scrappy like Mom's)  Almost completed
3. Red quilt for teacher (AC) This is the larger D4P (disappearing 4 patch) that is the Momma of the one from yesterday. Now to find backing and these these quilted. Already trimmed and binding sewn on.  Label is also made
2. Red quilt for teacher (JJ) Ready to trim.  Need to make binding and label.
19. May's Jo's club (MR) Ready to add binding.  This is a last minute addition.
20. May's Jo's club (SD) Ready to add binding. This is a last minute addition.

Label still needs to be done

Finished
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11
11. quilt baby quilt (MU) Mailed 5/14/11
9. Girl Scout quilt. Needs to be done by the 18th. (EF) UFO delivered 12 May 11
8. Baby quilt (M) Delivered 5/12/11
17. Baby Quilt (McC) Delivered 5/12/11
12. quilt baby quilt (MU) Quilting and binding this one. Mailed 5/14/11
7. Judy L's bear in the woods. Needs to be done by the 20th (DB) UFO 5/16/11
16. Batik Quilt (SG) UFO
5. Green and Purple quilt (BW)
1. RWB quilt (JC) (was an UFO)
18. Mug Rug (CA) UFO 5/28/11
6. Pink and green quilt. Started, but not finished. (KB) UFO 5/28/11

Almost there

Piecing still needs to be done ALL DONE, now to get the rest of them quilted.

I'm quilting away.  We went on a drive today and I almost got the baby quilt bound.  I have about 3 inches and the 2 sides of the label not on the edge.  I'm making progress.  Came home and quilted the Momma quilt.  That should have binding on it ready to stitch down in about an hour.  One more gift quilt that has to be done.  The QOVs and Angel Cover Ministry quilts probably won't get done this month, but will early next.


Quilting still needs to be done
13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt
2. Red quilt for teacher (JJ)

Binding still needs to be done

4. Red baby quilt (AC) (made one and was not happy with the size, so I'm making this pattern instead. It is a disappearing 4 patch. Fairly easy and I'm making it scrappy like Mom's)
3. Red quilt for teacher (AC) This is the larger D4P (disappearing 4 patch) that is the Momma of the one from yesterday. Now to find backing and these these quilted.


Label still needs to be done

Finished
10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11
11. quilt baby quilt (MU) Mailed 5/14/11
9. Girl Scout quilt. Needs to be done by the 18th. (EF) UFO delivered 12 May 11
8. Baby quilt (M) Delivered 5/12/11
17. Baby Quilt (McC) Delivered 5/12/11
12. quilt baby quilt (MU) Quilting and binding this one. Mailed 5/14/11
7. Judy L's bear in the woods. Needs to be done by the 20th (DB) UFO 5/16/11
16. Batik Quilt (SG) UFO
5. Green and Purple quilt (BW)
1. RWB quilt (JC) (was an UFO)
18. Mug Rug (CA) UFO 5/28/11
6. Pink and green quilt. Started, but not finished. (KB) UFO 5/28/11

Sunday, May 29, 2011

Fabric useage

Judy's stash report is what keeps me going.

My stash report for the week is:

Fabric usage goal (100 yards)--USED over 100 yards this year!
Fabric Added This Week --0.00 yards
Fabric Added Year to Date -- 11.00 yards
Fabric Used This Week -- 22.25 yards
Fabric Used Year to Date -- 100.09 yards
Fabric Used this month -- 37.79 yards