Pages

Sunday, August 28, 2016

To Do List

It has been a crazy week, so not much was accomplished

Baste Girl Scout Patriotic quilt (this might just wait until it cools a little so I can spray baste outside)
Quilty Fun Blocks
Started Shutterfly
You Can Digitize (Daily)
Work on Dark Blue UFO
Make backing for Maple Leaf
Make backing for Chinese Coins
Patriotic UFOs (there are 3 that I'm going to try and use together)
Quilt Lana’s quilt
Quilt Maple Leaf
3 QOVs to quilt

Work on Kailey’s quilt

I think I need to be much more realistic for the coming week.

You Can Digitize (Daily)
Work on Kailey’s quilt
Quilt Lana's gray quilt
Bind Maple Leaf
Cut out test quilt
Started Shutterfly

Friday, August 26, 2016

Not such a good sewing week

Well, I guess it was a great week for getting back into the swing of things.
but, it was a not so great week for the sewing machine.
I fixed a purse that was coming apart.
I did finish one applique block while waiting for DD.
I started another, but my hands began to complain, so I stopped.
I quilted Lana's Tumbler quilt.
I love it laid out like this. 
I tried to show the close up of the quilting, but I guess the thread blends too good.

I did get to practice my digitizing, but no time to stitch them out.

Other than that, none of the machines were run this week.

This weekend looks no better.
Girl Scouts Saturday and YOSA Sunday.

I plan to load a little at a time and maybe I can get a quilt ready for next week.


Monday, August 22, 2016

Monthly goals

So, I know I won't get these done this week, but I would like to get them done with month.
Not sure if that is possible, but I will give it a try.

Baste Girl Scout Patriotic quilt (this might just wait until it cools a little so I can spray baste outside)
Quilty Fun Blocks (2 new ones)
Test quilt cut out
Started Shutterfly
You Can Digitize (Daily)
Work on Dark Blue UFO
Make backing for Maple Leaf
Make backing for Chinese Coins
Patriotic UFOs (there are 3 that I'm going to try and use together)
Quilt Lana’s quilt
3 QOVs to quilt
Work on Kailey’s quilt

Thursday, August 18, 2016

Crazy Week

Well, not much got done.
Little bits and pieces were accomplished, but nothing big.
I did make another lanyard.
I am now needing to clean up after lots of paperwork activities.
I would like to come home to a nice area to work.
Leaving tomorrow afternoon for Mo Ranch for a YOSA Band Camp that I'm chaperoning.
No sewing this weekend, unless I get something to work on by hand.

Tuesday, August 16, 2016

Design Wall


Working the T-shirt quilt.
All the shirts are cut out.
Now to start the design of colors.
DD helped to arrange the shirts.

Sunday, August 14, 2016

Progress


Well, I didn't get lots done today.
I fought with the embroidery machine :(
I did get all the digitizing things done, but did not get the stitch out on one of the designs.

Work a little on the Stress Management Class
Started Shutterfly
You Can Digitize (Daily)
Work on Dark Blue UFO
Make backing for Maple Leaf
Make backing for Chinese Coins
Patriotic UFOs (there are 3 that I'm going to try and use together)
Started Stabilizer came in, so T-shirt quilt is added.

Stash REport

Judy has us keep track of what our stash is doing.
Used this Week:                                      0.17 yards
Used year to Date:                              161.42 yards
Total out of stash this Month (Aug)         3.22 yards
Added this Week:                                   0.00 yards
Added Year to Date:                             39.00 yards
Goal:                                                   200.00 yards
Yards to goal:                                        38.58 yards

Net Used in quilts 2016:                     114.24 yards 

A couple of other fun facts are:

Prairie Moon is doing a 350 blocks challenge this year:
Number of equivalent blocks:               436
Perimeter in inches                               7852
Number of UFOs finished this year:   42.16
UFO Yardage Used                              100.42
Amount of yardage used in UFOs          88%

Saturday, August 13, 2016

More To Do List


Work a little on the Stress Management Class
Started Shutterfly
You Can Digitize (Daily)
Work on Dark Blue UFO
Make backing for Maple Leaf
Make backing for Chinese Coins
Patriotic UFOs (there are 3 that I'm going to try and use together)
Stabilizer came in, so T-shirt quilt is added.

UPdate

Baste Girl Scout Patriotic quilt (this might just wait until it cools a little so I can spray baste outside)
Quilty Fun Blocks (I am taking this with me Saturday)
Take care of banking items
Work a little on the Stress Management Class
Started Shutterfly
You Can Digitize (Daily)
Work on Dark Blue UFO
Make backing for Maple Leaf
Make backing for Chinese Coins
Patriotic UFOs (there are 3 that I'm going to try and use together)
Marianne's star pattern test
It was a good day.
Played around with two of my blocks.
Put together another UFO block.
Cleaned up somethings
Did laundry
Had fun.

Small Quilt group

I worked on my Quilty Fun blocks - butterflies and spools at the top of the photo. 
We call this star Marianne's star. 
Ann Smith figured it out without templates.
I like the way it came out.
Now to figure out what to do with it.
I might use it in the Gypsy Wife quilt.

Friday, August 12, 2016

Weekend To Do List

Baste Girl Scout Patriotic quilt (this might just wait until it cools a little so I can spray baste outside)
Quilty Fun Blocks (I am taking this with me Saturday)
Take care of banking items
Work a little on the Stress Management Class
Started Shutterfly
You Can Digitize (Daily)
Work on Dark Blue UFO
Make backing for Maple Leaf
Make backing for Chinese Coins
Patriotic UFOs (there are 3 that I'm going to try and use together)


I've had a few crazy days.
My friend, Lorena, came by and helped with the embroidery machine.
It is stitching better, but....it still needs some help.
She said she would come back next week and spend more time on it with me.

I'm up to date on the You Can Digitize course, so that is good.
I imagine tomorrow is going to be sending in another design.

I have my small quilt group meeting tomorrow.
I do have  a massage scheduled in the middle of that, and I'm going.
What are your weekend plans?

Scoop bag

DD did not want her face in the photo, but the scoop bag is done.
It was quick and easy.
All from my scraps.

Tuesday, August 9, 2016

To Do LIst

Baste Girl Scout Patriotic quilt
Quilty Fun Blocks
Take care of banking items
Work a little on the Stress Management Class
Started Shutterfly
You Can Quilt 
Make Scoop purse
work on Dark Blue UFO
Find backing for Maple Leaf
Find backing for Chinese Coins

Tuesday happenings

 Finish the Maple Leaf quilt top.
Make needed phone calls
Baste Girl Scout Patriotic quilt
Quilty Fun Blocks
Take care of banking items
Work a little on the Stress Management Class
Started Shutterfly
Started Start on Kailey's T-shirt quilt. Ran out of stabilizer, so waiting for it to arrive.
You Can Quilt 
Well , I got my lesson done today, but with lots of heartache.
 Not from the digitizing, but from the embroidery machine. 
I'm not sure that I fixed it, but it is stitching and i can stitch out my design.
My first digitized design.
I am looking forward to learning what I did wrong and being able to correct the problems.

Then, I watched a YouTube on a scoop purse, and decided to make one.
DD picked out the fabrics from my scrap bins.
She found some fairly large pieces. 

I'll work on this tomorrow.

In-between all this, I had to deal with the cable company.
Our phone will not give us a dial tone.
tomorrow they are supposed to be out.
Guess that means tomorrow morning I pick up so they can get in here.

Oh, DD and I did the T25 exercise routine with a friend - lower body workout.
I can barely move and I did not do the intensity of my DD.

Maple Leaf top complete

Finally got the Maple leaf UFO top completed.
I need to find the backing and quilt it.

Continuing To Do List

 Finish the Maple Leaf quilt top.
Make needed phone calls
Baste Girl Scout Patriotic quilt
Quilty Fun Blocks
Take care of banking items
Work a little on the Stress Management Class
Shutterfly
Start on Kailey's T-shirt quilt.
You Can Quilt

I am having trouble with the embroidery machine breaking stitches.
I imagine there is a little piece of thread somewhere that I need to clean out better.
Will trouble shoot that when DH gets up.

Monday, August 8, 2016

Prairie Moon Organization Challenge

Change your rotary cutter blade

and/or
Clean off and back up your computer files

Well, this is a good challenge.
just backed everything up last night, so I guess I can count that as done.
I have noticed my rotary cutter is not cutting in one spot, so I'll try sharpening it and then if it is not good, I'll replace it.

Design Walls

Judy keeps us accountable with displaying our design walls.
I worked on the maple leaf yesterday, but didn't get it finished.
I'll add another top and bottom green border and then a fall print border. 
Decided I was not using some of the other leftover fabrics for this one.
Not even sure about the yellow and orange right now.

Sunday, August 7, 2016

Weekly to do List

 Finish the Maple Leaf quilt top.
I didn't get it finished, but 2 of the borders are on it.
One more green and then a fall print and it will be good to go.
Working Make needed phone calls
Baste Girl Scout Patriotic quilt
Quilty Fun Blocks
Take care of banking items
Work a little on the Stress Management Class
Shutterfly
Start on Kailey's T-shirt quilt.

To Do List

 Finish the Maple Leaf quilt top.
I didn't get it finished, but 2 of the borders are on it.
One more green and then a fall print and it will be good to go.
Working Make needed phone calls
Quilt QOV
Baste Girl Scout Patriotic quilt
Quilty Fun Blocks
You Can Digitize
Take care of banking items
Work a little on the Stress Management Class

QOV Quilted

Bad start to the day.
Hate it when things go wrong in the household. :(

Anyway, I went ahead and quilted the QOV.
It was loaded and didn't take lots of positive thoughts to work on it.

Stash report

Judy has us keep track of what our stash is doing.
Used this Week:                                      3.06 yards
Used year to Date:                              161.25 yards
Total out of stash this Month (Aug)         3.06 yards
Added this Week:                                   0.00 yards
Added Year to Date:                             39.00 yards
Goal:                                                   200.00 yards
Yards to goal:                                        38.75 yards

Net Used in quilts 2016:                    1114.07 yards 

A couple of other fun facts are:

Prairie Moon is doing a 350 blocks challenge this year:
Number of equivalent blocks:               435
Perimeter in inches                               7820
Number of UFOs finished this year:   42.16
UFO Yardage Used                              100.42
Amount of yardage used in UFOs          88%

Strange week.
But, I did get some QOV quilting done.
Maybe I can focus on sewing up a top today.

Saturday, August 6, 2016

Sunday to do list

This worked so well on Saturday, lets see how I do on Sunday.....

 Finish the Maple Leaf quilt top
Working Make needed phone calls
Quilt QOV
Baste Girl Scout Patriotic quilt
Quilty Fun Blocks
You Can Digitize
Take care of banking items
Work a little on the Stress Management Class

Update on To Do LIst

I need some accountability, so this is what I need to accomplish this weekend.

Started Normal household chores
Pick out fabric for test quilt
Filing
Clean off Desk
 Finish the Maple Leaf quilt top
Working Make needed phone calls
Load QOV
Quilt QOV
Baste Girl Scout Patriotic quilt
Quilty Fun Blocks
You Can Digitize

Well, I'm happy with my progress.
I can see wood on my desk. The question is "How long will it stay that way?"
The QOV is loaded and I can quilt it tomorrow.
I have the fabric picked out for the test quilt.
I filed everything, but I'm sure more will show up at some early point.
I also got lots of household things done that I've been putting off.
All in All, it's been a good day.

Whoop Whoop

I decided to do a whoop whoop post . Check out the others.
I have not done lots this week.  WE started an exercise program that has worn me out.
I did make a hedgehog pincushion for all those long arm needles.

I quilted a QOV

I started loading another QOV

We made pillows with the Special Reach kiddos.

I will take it, even though I had hoped to accomplish more.

Weekend To Do List

I need some accountability, so this is what I need to accomplish this weekend.

Started Normal household chores
Pick out fabric for test quilt
Started Filing
Clean off Desk
 Finish the Maple Leaf quilt top
Working Make needed phone calls
Load QOV
Quilt QOV
Baste Girl Scout Patriotic quilt
Quilty Fun Blocks

This is a little aggressive, but I don't have a car to go anywhere, so maybe I can make some headway.


Friday, August 5, 2016

Hedgehog Pincushion

I needed a little lightness today.
My life kicked me in the teeth and I wanted something fun.
Sooooo, I decided to make a hedgehog pincushion.
Hunters design Studio has this cute tutorial.
So, it says it takes 2 hours, but I think it took less than an hour.
I enlisted DD to put the old pins in for me. 
My hedgehog.
:)

To Do list update

I need some accountability, so this is what I need to accomplish this week.
DONE 8/3/16 1. Load QOV
DONE 8/3/16 2. Quilt QOV
3. Pick out fabric for test quilt
4. Finish the Maple Leaf quilt top
Working 5. Make needed phone calls
DONE 8/4/16 6. Finish matching socks
Started 7. Normal household chores
Started 8. Filing
9. Plan for Home Economics Class for DD

DD is finally interested in exercising, so I'm doing it with her.
We did Callenetics Evolution and oh my are my shoulders complaining.
Then, a friend asked DD is she would do T25 with her because she doesn't drive, I have to go with her. I can't just sit and watch, so I'm trying to do T25, but the intensity is above my capability.
So, I didn't do much else yesterday.
I did pull out the last QOV to start it being loaded.

No, it is not on the list, but still needs to be done.
Off to get the car worked on.

Wednesday, August 3, 2016

QOV #7

I loaded it this morning and finished quilting it this evening.
Did a double loop with a meandering stitch.

One more QOV to do.

To Do

I need some accountability, so this is what I need to accomplish this week.
DONE 8/3/16 1. Load QOV
DONE 8/3/16 2. Quilt QOV
3. Pick out fabric for test quilt
4. Finish the Maple Leaf quilt top
5. Make needed phone calls
6. Finish matching socks
7. Normal household chores
8. Filing
9. Plan for Home Economics Class for DD

Monday, August 1, 2016

Special Reach pillows

We had few kiddos than expected, but they still make some fun pillows.
It's always a pleasure to do this with them.
I still have some leftover, so maybe I can find someone else to use them with.

Patriotic UFOs

I think this patriotic wall hanging is going to get 2 other UFOs used in completing it.
I have a Patriotic Race Track that will work and Miscellaneous patriotic blocks and pieces.
I plan to use all 3 of these UFOs to finish this wall hanging/quilt.