Pages

Saturday, June 4, 2011

Taking it easy

I have to admit, I'm taking a breather.  I did do a larger sized speed strip quilt, but decided to cut it down and border it.  so, I'm getting 4 little quilts out of the one.  All the prints were novelty prints, so it only makes sense for them to be baby quilts.

I have a fun quilt to quilt for a neighbor.  Hopefully will get it loaded tonight and quilted tomorrow.

DH goes to the airport today and then it will be lonely and we will need something to do.

Wednesday, June 1, 2011

FINISHED

I didn't get the 3 charity quilts quilted this month, but I did finish the ones I needed.  So, here is the summary!

Quilting still needs to be done

13. Quilt QOV
14. Quilt QOV
15. Quilt Angel Cover Ministry Quilt
This is the one that I made, but didn't like the size, so I had to do something different. This still needs to be quilted.











Finished
4. Red baby quilt (AC) (made one and was not happy with the size, so I'm making this pattern instead. It is a disappearing 4 patch. Fairly easy and I'm making it scrappy like Mom's) Almost completed















3. Red quilt for teacher (AC) This is the larger D4P (disappearing 4 patch) that is the Momma of the one from yesterday. Now to find backing and these these quilted. Already trimmed and binding sewn on. Label is also made

 

20. May's Jo's club (SD) Ready to add binding. This is a last minute addition.

 

On top of everything else, DD graduated 6th grade.

18. Mug Rug (CA) UFO 5/28/11


5. Green and Purple quilt (BW)


 
1. RWB quilt (JC) (was an UFO)

 

Finished the rainbow bridge for Girl Scouts

7. Judy L's bear in the woods. Needs to be done by the 20th (DB) UFO 5/16/11



 
12. quilt baby quilt (MU) Quilting and binding this one. Mailed 5/14/11




 
11. quilt baby quilt (MU) Mailed 5/14/11


17. Baby Quilt (McC) Delivered 5/12/11


19. May's Jo's club (MR) Ready to add binding. This is a last minute addition.



9. Girl Scout quilt. Needs to be done by the 18th. (EF) UFO delivered 12 May 11


8. Baby quilt (M) Delivered 5/12/11


10. Quilt Dear Jane that I've had too long. It is in process, but it taking a bobbin of thread per pass. Yikes!5/9/11 Mailed 5/10/11



 
16. Batik Quilt (SG) UFO


Ended up making these water bottle carriers too.

 
6. Pink and green quilt. (KB) UFO 5/28/11










2. Red quilt for teacher (JJ)
This is in the washer and ready to dry.  I'll post when all is done.